Rossmoor News, Wednesday, March 18, 2026, page 11A
Stories on this page, to read as text
The page as printed
Rossmoor News • March 18, 2026 11A
(925) 942-3677
franksautoservice.com
1255 BOULEVARD WAY – ACROSS FROM 7ELEVEN
One-Stop Auto Care That You Can Always Count On
BRING THIS AD FOR $15.00 OFF ANY SERVICE $ $
Frank’s Auto Service
FOR WALNUT CREEK & ROSSMOOR RESIDENTS OVER 65,
WE OFFER VEHICLE PICKUP AND DROP OFF
Fun Facts 1. The Ford Mustang made its public debut in March 1964. The Mustang’s introduction created the “pony car” segment and remains one of the most successful automotive launches in history. 2. March is one of the biggest months for new car releases. Many manufacturers unveil upcoming models in early spring, building excitement ahead of summer buying season.
Spring is the Time for Maintenance
While much of the country uses March to recover from snow and freezing temperatures, here in California the focus is a little different. Instead of winter damage, March is all about preparing your vehicle for rising
temperatures, spring travel, and heavier driving conditions.
With milder winters and no road salt concerns, California
drivers often see wear related to stop-and-go traffic, long commutes, and fluctuating temperatures between
cool mornings and warm afternoons. March is the perfect time to address maintenance before summer heat places additional stress on engines, cooling systems, batteries, and air conditioning components.
As spring approaches, road trips, weekend travel, and spring break driving increase. Taking care of preventative maintenance now helps avoid breakdowns during peak travel months. Trent & DJ
1600 S Main Street, Suite 195, Walnut Creek, CA 94596 415-668-3130 • www.sterntax.com email: office@sterntax.com
Tax Preparation & Accounting
30+ years experience
Michael Fullam, EA Carol Dana-Fullam, EA
By Appointment, Walk-in, or Home Service
TICE VALLEY HAIR • NAIL SALON • BARBER SHOP
1954 TICE VALLEY BLVD., WALNUT CREEK (Rossmoor Shopping Center)
925-939-8111
OMAR’S HAIRCUT SPECIAL
$20 FOR MEN Mon.-Sat. 9am-5pm
MATHESON: Questions from March 6 Town Hall answered
Continued on page 12A
Continued from page 10A the Library and Computer Center may be relocated within the Gateway campus, they will remain a vital component of the services available. Expanded amenities will include a new board meeting room for all Mutual and RWC board meetings, a new food and beverage opportunity and central services available for residents. Q
: What advantages or tangible benefits will residents receive from the proposed plan? A
: The project is focused on improving the services and amenities to residents. Any improvements to staffing offices ultimately benefit the residents as the staff provides the majority of services and programs available for residents. The more efficiencies and the more stability we can provide for the staff, the more consistent the delivery of programs and services can become. New amenities such as a new library and Computer Center, new boardroom for Mutual and RWC meetings, new food and beverage opportunities and a fully renovated Dollar House all provide tangible resident benefits.
Residents also would benefit from a centralized desk that could meet all of their needs. We often hear from residents about the inconvenience of driving up the hill to handle questions about coupons and member records and how they are passed from one staff member to another when they have questions. A centralized desk would not be department-specific but instead would handle all resident questions and services in a single location. Q
: How might these proposed changes affect the marketing of
Rossmoor and the perception of prospective buyers who currently see Gateway as a central community amenity? A
: Gateway will remain a central hub but will be significantly upgraded. Services for residents will be more centralized. A new resident will be able to receive all their information from Member Records, Public Safety, Resales and Alterations and Community Services from one service area. Having the current offices at 800 Rockview as one of the first buildings a new resident sees for Resales is not beneficial. Q
: Has parking at Gateway and the Dollar House been fully evaluated as part of these proposals, particularly considering increased activity and the needs of an aging community? A
: An important aspect of the ELS scope of work will be evaluation of parking at both Dollar and Gateway. This includes current code for accessible spaces and paths of travel. Q
: What provisions are being considered for residents who currently walk to Gateway, such as Waterford residents who may not drive? A
: Residents will continue to be able to access Gateway by walking. Amenities such as the Library and Computer Center will still be accessible at Gateway. New amenities such as the boardroom, food and beverage opportunities and central services will be available. For any club activities moved to Dollar, residents can access the bus system, which is also scheduled for further evaluation to
improve the service in 2026. Q
: What plans are being developed for clubs and groups currently meeting in the Gateway multipurpose rooms, including the Men’s Exercise Group that has met there for more than 40 years? A
: Staff and consultants will be conducting some stakeholder group meetings to understand how amenities are currently used and what features need to be included in plans for renovations. Rooms at Dollar House will be available and accessible with a new elevator and improved access. Q
: How will accessibility and parking needs be addressed for groups that may be displaced from the Gateway multipurpose rooms? A
: A significant portion of the project is to focus on accessibility for the Dollar House. This includes parking, paths of travel to the house, restrooms and access to the second floor. Clubs that currently meet in the MPRs will have a home at Dollar or another clubhouse. Another aspect of the project is the creation of a new boardroom for mutual and RWC meetings. This will free up meeting room space at other clubhouses. Q
: Why were residents, clubs and Mutual boards not consulted earlier in the planning process before proposals and studies were initiated?
A
: This is a project that began in 2022 with the adoption of the Facilities Master Plan and in 2025 with the Food and Beverage Study. For each of these, there was significant public input through Town Halls, stakeholder groups, surveys and presentations.
ELS has conducted additional studies related to options for relocating administrative offices. These findings have been presented at the Planning Committee and in the Rossmoor News. The current study requires professional consultants to evaluate what is needed and what is possible within the existing clubhouse amenities. Before a project can be evaluated and discussed publicly, it needs to be developed and studied enough to determine if it is viable. We needed a proposal to be able to present and begin the discussion. Q
: What level of resident engagement and community input will occur moving forward during the planning and decision-making process? A
: Staff and the consultants will conduct several stakeholder meetings focused on Dollar and Gateway programs, services and amenities. Additional presentations will be made at the Planning Committee meetings and at other forums. Information will be available through the Rossmoor News regarding the progress of the planning project and opportunities for review and input.
Q
: Will changes to the Facilities Master Plan or the use of major community facilities be presented to residents for a vote or formal input? A
: Presentations will be planned as well as meetings with stakeholder groups. Decisions will ultimately be made by the RWC Board of Directors following reviews and recommendations from the Planning Committee and the Finance Committee. No public vote regarding the approval of the project is planned. Q
: Was the consulting contract for the current study competitively bid, and what is the scope of the work being performed? A
: ELS Architecture has conducted several studies related to the relocation of the offices at 800 Rockview. This has provided them with significant information regarding the staffing needs and operation. ELS has also completed previous projects, so they are very familiar with the community, public outreach and designs. For this project, staff did seek a competitive bid related to the full evaluation and development of design options for just the Dollar House. The proposed scope from ELS for both Dollar House and Gateway was lower. The scope includes evaluation of the existing spaces, evaluation of code compliance, evaluation of parking, initial review with the city,



