Rossmoor News, Wednesday, April 25, 2018, page 6A
Stories on this page, to read as text
The page as printed
Don H. Wayne EA
Income Tax Preparation
1255 Treat Blvd. Suite 300, W.C.
• Individual, Partnership, Small Business Returns • Estate and Trust Accounting • Wealth Preservation • E-file • Complimentary House Calls • By Appointment Only
Tax Services & Business Consulting, Inc.
Enrolled Agent • Former IRS Revenue Officer
MBA • Rossmoor Resident
925-472-0990 don@donwayne.com • www.donwayne.com
CA Insurance License #0L80332
A Professional Fiduciary Agency Dedicated to Serving Seniors and Those with Special Needs
•Trustee •Successor Trustee •Executor •Power of Attorney •Conservator •Healthcare Agent •Care Manager
(925) 465-5500 2125 Oak Grove Rd. #210 • Walnut Creek www.CSCf iduciaries.com
Call for a Free Consultation Dental Implant Solutions
(925) 478-4581 • www.DentalImplantSolutions.net
1855 Olympic Blvd. #320, Walnut Creek, CA 94596
When was the last time you enjoyed a crisp cold apple?
With just 2 implants get a comfortable denture! Too much pain and sore spots?
Get back to comfort with Implants as low as $985* FREE Consult ($500 value)
* $985 is the cost of each implant. The cost of attachment varies.
Use the “Green Line” bus from Rossmoor and get off at “Genova Deli” stop
CEO’s Report
By Tim O’Keefe, GRF CEO
Status Report: GRF Board
Goals for 2017-18
Each year, following the election of a new Golden Rain Foundation Board of Directors in May, the Board adopts goals for the upcoming year. The goals report below marks the conclusion of the 2017-18 Board year:
Create plan for synchronization
of GRF databases Problem: GRF uses separate databases to manage the diverse needs of the organization because there is not a software vendor offering a comprehensive solution that handles the variety of applications used in Rossmoor. The primary database is used to manage member records and financial data. Other databases are used for Recreation, Access Control, Security, Golf and Fitness Center management.
Goal: The Board recognized the challenge of managing an array of unlinked database applications and sought to minimize the manual effort needed to keep these systems linked.
Status: Staff researched comprehensive software solutions and could not find a single solution that universally met the needs of a majority of the departments. Staff then approached several software developers to create a software bridge link that would automatically synchronize all the databases. After reviewing our systems, all but one software developer has declined to bid. Staff is continuing to pursue other developers with the expectation that it will result in multiple bids. The Adhoc Technology Committee is also researching options.
LED lighting retrofit for streets and buildings
and other energy efficiency projects Problem: Incandescent and fluorescent lights use significantly more energy than light emitting diodes (LED), which continue to evolve and have become more economical.
Goal: GRF could realize savings on utility bills
if LED lighting was installed.
Status: Several resources have been engaged to begin research on options including our PG&E representatives, MCE representatives and the consultant working on the solar project. Working with MCE, GRF has installed several test LED lamps in parking lots and on Rossmoor Parkway to gauge light levels and any potential light spillage. LED lights project a brighter, whiter, light. The purpose of the test lights was to see if there was any negative feedback. Hearing none, two weeks ago, LED lights were installed throughout the Gateway parking lot.
LED street lights are very expensive. We will seek proposals for changing out the street lights to evaluate savings and the return on investment. Rebates from PG&E and MCE will also be evaluated. Additional work on street light conversion will be done in the spring of 2018.
The conversion of lighting in clubhouse facilities has been done by staff and will continue to be done over the course of the next year and as renovation projects are completed. This past year, the lights in the Tice Creek pool area were all changed to LED. Lights at Hillside and Dollar have also been converted to LED.
Other energy efficient projects have and will continue to be the replacement or upgrade of pumps to variable frequency drive (VFD). This was done at the Tice Creek pools with rebates of over $6,000 from MCE. Hillside and Dollar pool pumps will be evaluated next as well as irrigation pumps for the golf course.
And lastly, the solar farm is still running through the city’s and PG&E’s planning processes. Once operational, it is anticipated that this 1-megawatt facility will generate about 65 percent of GRF current energy needs.
Start planning water reclamation facility Problem: At the height of the drought, the state declared that irrigation for golf courses had among the lowest priorities of all water users in the state. As a result, the state imposed a 40 percent reduction in water usage for golf courses. In addition, EBMUD imposed a 25 percent surcharge. State water officials had indicated that if the drought had continued through the summer of 2017, golf course
operators would have faced a 60 to 80 percent reduction in water. Water reductions at 60 percent may have made the courses largely unplayable and at 80 percent would have killed much of the grass on the course and resulted in millions of dollars of damage.
Goal: The drought illustrated the critical importance that water plays in making our landscape and golf courses green, playable and attractive. This is obviously important to golfers but also essential to the overall beauty of the golf courses as a park-like feature adding value to every home in Rossmoor. A critical benefit of the golf courses is that the green space provides a fire break and evacuation zone for the valley. As a result, the GRF Board authorized the exploration of water reclamation in order to ensure the viability of the golf courses.
Status: GRF retained the services of a water reclamation consultant to determine whether there appeared to be adequate sewage discharge, if there was a suitable site for the physical plant and to initiate discussions with the city of Walnut Creek, EBMUD and Central Contra Costa Sanitary District. The consultant’s report will be discussed at the April 26 GRF Board meeting.
Implement remodel of Gateway studios Problem: When the Gateway Clubhouse was renovated in early 2000s, the studios were untouched while the clubhouses and theater received the bulk of the attention. As some of the oldest buildings on campus, the studios were designed as multipurpose facilities but have evolved to single use. With wait lists due to space constraints, the studio clubs have requested that their facilities be optimized for efficiency to make better use of their space for doors, windows and equipment.
Goal: The Board decided that it was time to begin the process for a future remodel of the Gateway Studios.
Status: A space planner began working with the studio clubs in 2016 and early 2017. In February 2018, the Board authorized the hiring of an architect to formalize the design plans.
Create Planning Committee Problem: The Board recognizes that there are many needs and competing interests from various
Continued on next page
6A Rossmoor News • April 25, 2018



