Issue

Page 11A

Page 11A

Rossmoor News, Wednesday, July 12, 2017, page 11A

Stories on this page, to read as text

The page as printed

Rossmoor News • July 12, 2017 11A

THE DOOR IS OPEN AGAIN IN ROSSMOOR Looking for a Reverse Mortgage or need to Refinance your Reverse Mortgage? Get another quote before you decide

As with any loan, you should seek the lowest interest rates and closing costs.

Many people do not realize you get the same gross amount of money (Principal Limit) no matter who you work with. What is most important is getting the lowest interest rate and fees. Others charge higher interest rates and fees. Call for a FREE QUOTE and I will personally show you the difference. Just five minutes of your time could save you thousands of dollars. This only benefits YOU!

Call today and work with a Branch Manager and Licensed Certified Public Accountant with 35 years of financial experience. “I pledge to provide extraordinary service with honesty, straightforwardness and integrity.”

Is a Reverse Mortgage Right for You? • If you are 62 or older and own your house, a Reverse Mortgage may benefit you! Benefits of a Reverse Mortgage • Turn Home Equity into Cash • Flexible Payment Plan, including No Payments* • FHA-Insured Program for Seniors

David C. Chee, CPA

NMLS ID 263222

*Borrower to remain current on their property taxes and homeowners insurance and HOA fees, occupy home as primary residence and maintain the property. High Tech Lending, Inc., Licensed by the Department of Business Oversight under the California Residential Mortgage Lending Act. NMLS #7147. 4695 Chabot Drive, Suite 200, Pleasanton, CA 94588. NMLS Consumer Access: www.nmlsconsumeraccess.org.

Call David Chee, CPA and request a FREE QUOTE

1.800.967.3575 www.davidchee.com

Serving the

Bay Area!

Work on Del Valle pools stalled due to access issues

Continued from page 1A

“As the pool project is associated with the other (Fitness Center) project, the city needs to check access, especially since the temporary access is through the patio,” said Matheson.

He said Walnut Creek has a construction valuation threshold of $150,000 for determining how much of the building needs to be brought up to current accessibility code.

Currently, the pools are accessible from the patio via three steps down from the parking lot or there is also a flat path.

There are two doors to negotiate: one security-type double door from the steps and path to the patio, and another single door from the patio to the pools.

The next step is a review of the facility by an access specialist to determine what items need to be brought into

compliance.

These items include such things as lifts, pool deck, hand rails, steps, signage, doors and door handles.

Cost of work The original cost of work on the Del Valle pools and sauna was $466,500, which was approved by the GRF Board earlier this year.

That included $165,000 for the plaster job and $182,500 for replacing heaters and pumps.

A new addition of an ultraviolet sanitation system to remove contaminants and improve indoor air quality came in at a cost of $120,000.

An accessible unisex changing room with shower and toilet, located off the pool deck, is also planned.

Any additional work that results from the city’s assessment will doubtless affect the project budget, but the dollar figure is yet to be determined.

“Currently we are evaluating what additional work will need to be included in the project to bring the facility into compliance with current building code with respect to accessibility,” said Matheson. “Once this is complete we will have a better idea of the impact on the project budget.”

Residents’ reactions Matheson said there was a “significant outcry” from residents when the pool closures were first announced.

But the outcry has since subsided, since swimmers still have access to the same classes at Dollar and Hillside pools – there have been just minor adjustments for lap swimming and bee issues.

“All in all, people have adapted well and have been very patient – which we appreciate,” said Matheson, adding that both Dollar and

Hillside pools are up to speed on maintenance.

Matheson said that once they get clearance from the city to complete the work on Del Valle – so far, just the plaster and tile have been removed – it is anticipated that the work will take three or four weeks to complete.

All the components for the project, such as heaters and pumps, are already on site, just waiting for the city’s green light before they can be installed.

And the good news, said Matheson, is that the Fitness Center renovation is right on track.

“We’re looking at furnishing the facility in December and having an early January opening,” he said.

Meanwhile, residents can continue to enjoy exercise classes in the three Modulars located in the Del Valle parking lot.

As of July 5, the Recreation Department has modified the rules for lap swimming at Hillside pool until the Del Valle pool renovation is complete. The revised rules are as follows:

1. Lap swimming is limited to 30 consecutive minutes when another person is waiting.

2. Use of a lap lane may be extended to 60 minutes if two or more swimmers have agreed to share a lane.

3. Swimmers are responsible for monitoring their time in the lane and promptly vacating at the end of their time.

4. If no swimmer is waiting for a lane, then a swimmer may continue swimming for a second 30-minute session.

New rules are in effect for lap swim at Hillside

Emergency information Here is how residents can find out more information during water and power outages and emergency situations such as a fire: Tune in to Channel 28 and watch for a “crawl” across the bottom of the screen that runs a continuous announcement of the emergency. Check the Rossmoor website, www.rossmoor.com. Hit the News and Events tab and then Breaking News. Or Call the Rossmoor Information Telephone Service at 988-7878. At least one of these forms of communication should have the information.