Issue

Page 4A

Page 4A

Rossmoor News, Wednesday, August 19, 2015, page 4A

Stories on this page, to read as text

The page as printed

The Rossmoor News (927080), established April 15, 1965, is published every Wednesday, for a subscription rate of $45 per year, by the Golden Rain Foundation, 1006 Stanley Dollar Drive, Walnut Creek, CA 94595. Periodical postage is paid in Walnut Creek, CA. POSTMASTER: Send address changes to the Rossmoor News, 1006 Stanley Dollar Dr., Walnut Creek, CA 94595.

Rossmoor News

DEADLINES: • Wednesday at noon – Religion notices and Club Trips • Thursday at noon – press releases, club news and event announcements • Friday at 10 a.m. – Display and classified ads, letters to the Residents Forum and obituaries

The Rossmoor News is legally adjudicated to publish legal notices and fictitious business name statements. The News reserves the right to reject or discontinue advertisements or articles that the manager deems unsuitable. All articles are subject to editing.

TELEPHONE: General information and display and classified

advertising: 925-988-7800 Fax: 925-988-7862 MISSED PAPER: Report missed papers by Thursday noon to ensure

delivery. Call 988-7800 and give complete address with entry. ADDRESS: 1006 Stanley Dollar Drive, Walnut Creek, CA 94595 OFFICE HOURS: Monday through Friday, 8 a.m. to 4:30 p.m. E-MAIL ADDRESS: news@rossmoor.com. News articles and letters

to the editor can be submitted to this email address: news@rossmoor.com. Classified ads and payment information can be emailed to newsdesk@rossmoor.com or faxed to 925-988-7862. Articles and ads cannot be submitted through the website. All emailed ads and articles will receive a confirmation from News staff. WEBSITE: www.rossmoor.com and www.rossmoornews.com STAFF: Maureen O’Rourke, Manager

Chrissa Basbas, Editor/Administrative Assistant; Wilma Murray, Staff Writer/Editor; Cathy Tallyn, Staff Writer/Editor. Production: Lance Beeson, Kerry Curran, Celeste Fitzsimmons, Production and Graphic Specialists; Mike DiCarlo, Photographer. Display Advertising: Cheryl Dillard, 988-7811, Account Representative and Trisha Engelmann, 988-7809, Account Representative. Office: Jacqueline Blaauw, reception, classified and legal advertising. Website: Lina Liu, web content. Contributing Writers: Various writers, Democrats of Rossmoor;

various writers, Progressive View; Charles Jarrett, Entertainment Notes; R.S. Korn, Eye on DVDs; Bill Leary, Engaging Aging; Tom Mader, At Wit’s End; Ed Manning, Republican Perspective; Robert Moon, Modern Classical CDs. Volunteers: Tom Fryer, Judie Huse and Marilyn Allen.

4A Rossmoor News • August 19, 2015

and combined the plans to create Option A+, one phase-able option meeting those criteria. The proposed changes would include: more spacious locker rooms; bright spaces with higher ceilings; enlarged area for fitness equipment and additional training circuits; new fitness room for small-group training; large area for stretch, balance and core training; three new studios; inviting views into activity spaces and exterior views to the trees and landscaping; new ventilating, heating and cooling; enhanced resident services with new entry and service center, social space and assessment rooms; and a green and sustainable design.

To make all this happen, the lobby and entryway would be moved around the corner to the street side of the building. The area for fitness equipment would be expanded the full length of the building from the pool area into where the current Sierra Room is. That room would be divided by a wall, separating fitness/train-

ing areas from the multi-purpose gym. All along the front of the building would be windows to add extra light.

The current kitchen would be converted into a multiuse studio, the Delta Room into a wood floor studio and the Shasta Room into a “quiet” studio. Both locker rooms would be reconfigured and expanded and the ceiling raised. Heating and air-conditioning systems would be revamped.

The phasing would be organized, Matheson said, in

Phasing of Del Valle project discussed at community forum

Jeff Matheson

News photo by Mike DiCarlo The Fireside Room was divided into tables so that residents could converse about the Del Valle Complex renovation project. A representative of each table presented the results of that group’s discussion.

Continued from page 1A

Continued on next page

order to allow use of the complex throughout construction. Maintaining access is a key factor, Matheson said. “This is a really important one.”

Phase one would focus on expanding the fitness area and raising the roof as well as demolishing the kitchen. A partial wall would be placed in the Sierra Room. Phase two focuses on studio spaces. The third phase would improve the Sierra Room with new flooring and windows. The final phase would address the locker rooms.

The diagram of Option A+ (see accompanying photo) is simplified. “These are space

plans,” Matheson said. No details have yet been worked out. “There’s a lot of work still to be done.”

Before the phasing begins, Matheson said, the planning stage would happen and take until at least the winter or fall of 2016. This would include all the detailed design elements, proposals and permitting.

Resident input Representatives from the

Photos on this page

  • Jeff Matheson speaks into a microphone at a lectern, wearing a striped polo shirt. Caption: Jeff Matheson
  • Residents sit at round tables in the Fireside Room, talking together in small groups. Caption: The Fireside Room was divided into tables so that residents could converse about the Del Valle Complex renovation project. A representative of each table presented the results of that group’s discussion.