Issue

Page 7A

Page 7A

Rossmoor News, Wednesday, October 28, 2026, page 7A

Stories on this page, to read as text

The page as printed

Rossmoor News • October 28, 2026 7A

RWC AND MUTUAL NEWS

Tom Pruitt

DEEP TISSUE MASSAGE – RELAXATION

ROSSMOOR SPECIALIST

• State Certified 1985 # 10734 • American Massage Therapy Assoc., 35 yrs. #4485 • Chinese Sports Massage study program, Beijing 1988 • Therapist – Olympic Athletes, Calgary 1988 & Hawaii Ironman 1996

Massage Therapist

925-989-2011 TomPruitt1@gmail.com References Available

By Bob Kelso Mutual secretary

The Second Mutual Board of Directors adopted its 2027 budget. The new coupon amount will be $1,315 per month plus property taxes. That is a $21-a-month, or 1.6% increase, over 2026.

Increases from Rossmoor Property Management (RPM) of $9.55 and Rossmoor Walnut Creek (RWC) of $11.45 account for the monthly rise. Second Mutual had no increase in its assessment. Residents will be receiving a budget booklet in the mail in early December showing all of the details.

Infrastructure rehabilitation will be a focus in 2027. Most of the savings from the reduced insurance premiums

were moved into the reserves to help address the long list of needed infrastructure work.

There are three buildings in need of stabilization; more than 40 buildings in need of galvanized pipe replacement; many more Zinsco panels to replace; 50 water-cooled air conditioners to replace out of the original 480; and several entries in need of asphalt replacement. These projects will take several years to complete.

The prediction is for a rainy winter. Residents should email serviceorder@rossmoor.com or call 1-925-988-7650 if they notice plugged drains or downspouts. If it is urgent and on a weekend or holiday, call Public Safety at 1-925-988-7899.

Tiek a Rom a nof f wa s re-elected to a three-year term

Second Mutual board approves 2027 budget; monthly coupon will be $1,315

on the board by acclamation. The other two candidates for the one open seat withdrew before the ballots were mailed.

Therese Welter, chair of the Water and Conservation Committee, reported that Second Mutual’s water use between January and September has declined by 25,340,624 gallons compared with 2022. The cost of the water used has gone down by 4%, or $41,465, during the same period, even though EBMUD has raised rates 29% since 2022. These savings are due to the replacement of water-cooled air conditioners and lawn conversions.

The total money saved during

those four years is estimated to be $165,000, over $41,000 a year. That savings will continue and increase as more air conditioners are replaced and more lawn conversions are completed. Unfortunately, Welter has decided to step down as the chair as of December.

Second Mutual is looking for a volunteer to monitor its water usage. Welter has set up the system and thinks her job could be done in just a few hours a month and possibly only need to be done bi-monthly or quarterly. Email swcm@rossmoor.com if interested in information about the position.

Yearly manor inspections

have started. They only take a few minutes. If residents miss the knock on the door, they should call the number on the door hanger and schedule their inspection. Toilets will be checked for leaks, and smoke detector batteries will be replaced.

The board officers will remain the same for 2027.

The next regular board meeting will be held Thursday, Nov. 19 at 10 a.m. in Peacock Hall.

Save the date: The second annual Pie Party for Second Mutual members will be held Wednesday, Dec. 9 from 2 until 5 p.m. in the Fairway Room.

GM’s Report

By Jeff Matheson, RWC General Manager

Capital Planning Process, RWC,

Mutuals, Resources and More

Rossmoor Walnut Creek

capital planning process

On an annual basis, the RWC Planning Committee, Finance Committee and RWC Board of Directors review the RWC capital program. The Planning Committee reviews and prioritizes projects based on a scoring system that prioritizes health and safety items, maintenance of existing assets, and code compliance. Projects that have been approved are updated based on the project status.

Long-term planning documents, such as the Facilities Master Plan, Food and Beverage Study and capital replacement plans are used to develop the projects for consideration. The capital plan contains funding for ongoing maintenance items and capital machinery and

the one-time fee paid upon the transfer of title or designated occupant for each manor. Through the end of September 2026, the $18,000 fee had generated $4,743,500 this year.

The RWC Capital Fund has also received resources from the sale of the property at 1220 Rossmoor Parkway (former medical center). In 2023, the property was in escrow; however, the buyer defaulted resulting in RWC receiving $1.4 million in deposits. These are the resources that have been used to fund the various studies related to the Gateway/Dollar/ Rockview projects. The property is again in escrow, with the sale scheduled to close in 2027. The sales price is $17.2 million. These resources will be available to pay off existing loans and to complete major capital projects identified in the long-term planning documents for RWC.

It is important to note that capital funds for RWC cannot be used for Mutual capital projects, and vice versa.

Impacts on the coupon Capital decisions by the RWC Board can impact the

monthly coupon in a variety of ways. It is important to note that all capital projects and related studies are funded by the capital fund and not through the coupon. Capital projects can still have a lasting impact on the RWC portion of the coupon; new facilities come with additional expenses, including property taxes, insurance coverage, operating expenses such as maintenance, cleaning, and landscaping. These expenses are added to the cost of operations, which are paid for through the RWC portion of the coupon. The anticipated additional coupon cost for the new pickleball facility is approximately 50 cents per manor per month to cover the above-mentioned expenses.

Capital projects can also reduce operating costs through modernized systems, improved energy efficiency and reduced maintenance and mechanical needs. Investment in capital projects also helps maintain Rossmoor’s overall value, which can positively impact property values. Smooth roads, modern amenities and quality landscaping all add to the

overall value of the community. Capital projects can also add to the security and safety of the community. Investing in open space maintenance, fire hardening projects, and security gate improvements increases the value of Rossmoor.

Where can you find more information?

The capital project prioritization list will be introduced to the Planning Committee during its regular meeting on Nov. 12 at 10 a.m. in the Board Room at Gateway. Agendas for all RWC committee and Board meetings can be found at myrossmoor.com

Employee transitions In September, three employees commenced employment with RWC:

Stephen Davenport, Bus Driver, Transportation

Jesse Rosenberg, PTOC Videographer, Rossmoor TV

Kyla Menconi, Lifeguard, Aquatics

In September, two employees separated from RWC:

Jose Albarran, Head Lifeguard, Aquatics

Ricardo Garcia, Lifeguard, Aquatics

equipment. Examples of these items include slurry seal projects, open space maintenance, replacement of chairs at the Event Center, replacement of company trucks and specialty golf course equipment such as mowers and aerators.

RWC capital vs

Mutual capital The 23 Mutuals in Rossmoor are all independent corporations, each with its own operating and capital budgets. Mutuals use reserve studies, visual inspections and code compliance to prioritize and approve annual capital projects. Funding for these projects is included in the Mutual portion of the monthly coupon.

RWC Capital Fund

resources All RWC capital projects are funded through the RWC capital fund. Revenue is received from the Membership Transfer Fee (MTF). This is

The Rossmoor website is full of information. Check it out at www.rossmoor.com