LEAVE RPM STAFF AT ROCKVIEW
David MinorShadowhawk Way
In print on page 22A
I was dismayed to read the proposed $16 to $18 million renovation plans. At that price, I would expect amenities such as a new basketball court, theater, Olympic-size pool or auditorium. The vast majority of Rossmoor residents want Rossmoor Property Management staff to stay where they are – up at Rockview.
If Jeff Matheson wants to be closer to his employees, have him take a small second office at Rockview. I am glad to see that Option 1 now includes the possibility of renovating the current Rockview building with improved drainage and plumbing fixtures, which could cost as little as a few million dollars, making it the most affordable option. Before anything more is done, the Rossmoor Board should hire an independent structural engineer/building inspector to report on the building’s structural stability and describe what needs to be done at Rockview to improve the staff building. Two of the three options presented would also overcrowd the Gateway parking lot.
Even if the sale of the John Muir building nets $8 million-plus, most residents do not want Rossmoor Walnut Creek to take on the debt required to undertake a $16 million capital project, and every increase in the transfer fee is effectively a tax on residents selling their manor.