Issue

Page 4A

Page 4A

Rossmoor News, Wednesday, May 27, 2026, page 4A

Stories on this page, to read as text

The page as printed

4A Rossmoor News • May 27, 2026

Find out how dental

implants can help you enjoy eating again

• Immediate Long-term results • Preserve Jawbone- Looking & Feeling younger • Start enjoying your favorite foods

2211 Olympic Blvd., Walnut Creek

Do missing teeth prevent you from

eating your favorite foods?

Single Arch As low as $215/mo

Cost $14,995

Overdenture

As low as $209/mo

Cost $8,995

Zirconia

Single Arch Cost $19,995

CONVENIENTLY

LOCATED! CALL (925) 930-8488 and schedule your appointment TODAY! www.JULIALEEDDS.com Monday - Friday | 8:00 - 6:00

FREE DENTAL IMPLANT

CONSULTATION

*FOR NEW PATIENTS ONLY *FREE CONSULT WITH CONE BEAM

DENTAL IMPLANT STARTING AT

$1,587

$195 CLEANING, EXAM & X-RAY *IN ABSENCE OF GUM DISEASE NEW PATIENTS ONLY

RESTRICTIONS APPLY

Donna Reynolds

650.888.6413 belladonna1941@gmail.com

Redesigned homes on HGTV, taught

classes nationwide, member of nationwide organization – IRIS – Interior Redesign Industry Specialists

Home Rearrangements

Design with your furnishings

in ONE DAY!

$5

1954 Tice Valley Blvd., WC (in Rossmoor Shopping Center)

Monday - Saturday 9:30am - 5pm By Appointment, Walk-in, and Home Service

925-939-8111

Tice Valley Hair & Nail Salon & Barber Shop

Sue

ACRYLIC NAILS OR PEDICURE

O

F F

Security Reports

FROM SECURITAS

The following are the major incidents reported to Securitas, Rossmoor’s security service provider. They appear here as they were initially reported to Securitas. After investigation, details of a case may indicate a lesser or different incident description. If the case warrants it, the News will do a follow-up story.

Friday, May 15 Vandalism: A resident reported that someone wrote a racial slur with a black marker on the side wall of a carport in the 2400 block of Pine Knoll Drive. The resident told Securitas they would contact RPM for removal if they were unable to do so themselves.

Saturday, May 16 Fire: A resident reported at 7:45 a.m. seeing smoke coming out of a sidewalk vent near Cactus Court Entry 7. Both the Contra Costa Fire Protection District and PG&E were contacted to respond to the issue.

Sunday, May 17 Elevator: A woman reported at 9:26 p.m. that she was stuck in an elevator in the 1800 block of Stanley Dollar Drive. ConFire responders were able to free her from the elevator. Out-of-order signs were placed on the doors. An elevator company was contacted for repair.

In an emergency, call 911. To report a security incident in Rossmoor, call one of these numbers:

• Front gate, dial 1-925-939-0693. • Immediate assistance requests for service, dial 1-925-988-7899. • Or email dispatch@rossmoor.com

How to contact security

PROPOSALS: Residents attend Open House

Continued from page 1A code.

No. 2: Moving most RWC and RPM functions now at Rockview into a significantly remodeled Gateway clubhouse and administration building. The open space between those two buildings would be filled in, and the Library and Computer Center would be moved from their spaces at Gateway Clubhouse into a remodeled Multipurpose Room building at Gateway. Clubs and other groups that now meet in the MPRs, RWC General Manager Jeff Matheson said, would meet in a renovated Dollar Clubhouse. These changes were the original scenario that was the subject of a March 6 Town Hall meeting at the Event Center ‒ a plan that generated significant discussion over the past few months.

No. 3: The “community hub” model, leaving the Library and Computer Center in Gateway Clubhouse (although the Computer Center would move a short distance), adding food and beverage service to the clubhouse, moving the Board Room to the remodeled MPRs, and bringing Rockview staff to Gateway (including the area between the clubhouse and admin buildings that would be enclosed). Clubs and other groups that now meet in

the MPRs would meet in the renovated Dollar House.

All three options provide for sorely needed renovations at Dollar, including updated restrooms, a café and an elevator to improve access to the second floor, where new meeting rooms would be created from old, underused spaces. All three options also include adding some form of food and beverage service to Gateway, either indoors or in an outdoor court area between the two existing buildings, depending on the improvements eventually approved.

The Open House itself got mixed reviews from attendees. About a dozen of them said they were confused by the way the information station boards were numbered. Descriptions of the three basic options listed above, having been identified under those numbers in previous public discourse, weren’t on similarly numbered station boards. Seeing option No. 1 on board No. 1, and so on, would have been easier to digest, they said.

And each station, however they were numbered, presented a lot of information.

“I’m still trying to figure it all out,” Les Klein said. “Maybe it isn’t imperative that all this has to be done at once.”

“It’s a little overwhelming,”

Sharon Castilla said. “I know we’re seniors, but we still have brains.”

Added Lynn Beuselinck, “A lot of people don’t understand the technical parts of each option.”

A few people, including Beuselinck and Josie Yu, wanted to see more specific size measurement information, especially regarding amenities like the Computer Center and the Library, which could wind up with new homes. Others, like Klein and Dave Kosters, were asking representatives of RWC’s partner, ELS Architecture and Urban Design, for more cost information.

Dave Masenten of ELS said it’s early in the process to have refined cost estimates, but he said each of the three options would be expected to be completed for between $16 million and $18 million.

But attendees said they were glad RWC was going to such lengths to gather feedback on this project.

“They’re getting people’s opinions, and that’s what they need to be doing,” Bob Hajny said.

He had a few opinions himself; Hajny said he went to Gateway recently to see what was going on there. “People there were having a good time; Gateway was a real ‘community center,’” he said. “I think Rockview needs to stay at Rockview.”

Based on the resident feedback gathered May 20, another event will be scheduled to review that input and how it can or cannot be addressed within each option. Refinements will be prepared for review … and more input. This process will continue until the RWC Board has enough information to consider approving a preferred design option, which could well look different from any of the three current options. Construction isn’t expected to begin for a few years, perhaps by 2029.

Meanwhile, the three options detailed at the Open House, and a timeline of studies and reports related to the overall Gateway-Dollar-Rockview project dating back to December 2004, are now included on the MyRossmoor website. A link to the timeline can be found in the Quick Links on the MyRossmoor homepage, or go to https://tinyurl.com/rwc-project-timeline to view it directly.

Where Is... ROTARY PEACE PARK: Located at Tice Creek Drive and Avenida Sevilla, it has paved pathways up to the top of the park, where residents can enjoy views of golfers at play as well as the Rossmoor valley. Parking is nearby at Buckeye Grove or along the street.