MUTUAL NEWS
Third Mutual reviews reserve study providers with contract expiring in 2027
By Lyman ShafferMutual secretary
In print on page 5A
The Third Mutual Board of Directors met on April 13 at Gateway Complex. One of the items discussed was a review of reserve study providers.
Each Mutual is required by state law to have an outside party review the adequacy of the Mutual’s financial reserves against projected maintenance requirements. This involves a physical inspection and inventory of all buildings and other infrastructure every three years.
The study projects the useful life of each building’s components and the cost of replacement over a 30-year period. The report is updated annually with a new physical inspection every three years.
The contract with the current outside firm will expire in 2027, and the board decided to review other options. Gary Porter of Facilities Advisors International (FAI) made a presentation describing the firm’s approach to conducting these studies.
FAI is familiar with Rossmoor as it currently does reserve studies for both the First and Second Mutuals. FAI has submitted a proposal that will be reviewed by the board.
The board also approved a number of contracts in amounts in excess of $5,000 for elevator repairs, paving, building rehabs and landscaping. It also ratified a contract for smoke detector replacements, which is expected to start in May.
After discussion, the board voted to allow each director to review and approve contracts for amounts less than $10,000. The board will continue to review and approve contracts in excess of $10,000 as required by the governing Civil Code.