Rossmoor News, April 8, 2026

LIMITED OPPORTUNITIES TO CONSIDER ALTERNATIVES

Gisèle HuffTerra California Drive

In print on page 26A

At the March 26 RWC Board meeting, I made this point in response to Jeff Matheson’s statement: “Here is the definition of a design study in the construction industry ‘A design study is a preliminary research and analysis phase used to evaluate the feasibility, impact and constraints of a proposed project before the final design begins.’ It is not structured to consider alternatives to the design, just its feasibility.”

When one says this is not a done deal and community input will be taken into account, it’s hard to see how this will happen, not only because it is a done deal, but because the opportunities for that input will be limited to residents of RWC’s own choosing. These will include club presidents and specific focus groups whose input, according to the definition, will have to address the design study as is, not suggest alternatives for consideration, which will then be pursued by the architectural firm.” As I understand it, the focus groups will be chosen by ELS.

Words matter and part of the uproar from the community about this project is that we feel we are being bamboozled.