Flag policy gets initial nod from Board
Members also hear more from residents on Gateway proposal
By Sam RichardsStaff writer

The Rossmoor Walnut Creek Board on Thursday seems poised to adopt a procedure for flying official flags, which includes adhering to either federal or state policy governing when flags are lowered to half-staff.
These new procedures, which had their first reading before the Board last week, will be Rossmoor’s first formal flag policy. Until now, Rossmoor managers have taken their cues from the president and from federal facilities and lowered the flag on occasions when the feds did so.
The Board will have a formal vote on the flag protocol upon second reading, likely at its April meeting. It is at that point when the new procedures will become official. Until such a vote, there will be no formal procedure or policy to guide such things.
And while Rossmoor’s proposed flag protocol covers various aspects including display and handling consistent with federal and state guidelines, Rossmoor’s historical practice of going along with federal flag proclamations was questioned after Rossmoor lowered its flags to half-staff (following a similar federal move) after the Sept. 10, 2025, assassination of conservative political activist and media personality Charlie Kirk. That action was criticized by some Rossmoorians who contended that action could have been interpreted as Rossmoor taking a political stand, given that RWC policy didn’t specifically dictate the flag be lowered. That lowering triggered considerable public discussion, starting with the RWC Policy Committee.
Board member Susan Hildreth said she appreciated that “significant citizen input” about a formal flag policy. “I think it’s good we’re establishing a procedure,” she said on Thursday.
The United States Flag Code covers when to lower the flag on certain days, such as Memorial Day, or specific occasions. Whether flags are supposed to fly at half-staff to honor a person (other than the president) is a matter of presidential proclamation. Rossmoor does not fly a state flag on either of its two flagpoles.
Golf bridges The RWC Board on Thursday approved by a 6-0 vote moving to Phase II of the project to replace two bridges carrying the main golf cart path over Tice Creek on the Creekside course.
Following the recommendations of both the Planning Committee and the Finance Committee, RWC will now spend up to $122,132 from its capital budget for BKF Civil Engineers for Phase II of work to replace the golf bridge adjacent to the Hole 5 fairway and the bridge near Hole 7 and the Hole 7 tee boxes. This new work will include producing construction documents and creating specific designs for consideration.
In January 2023, these bridge replacements were among the “Priority 1” capital projects approved by the Board, part of a larger plan to replace all the golf course bridges by the end of 2033. The long-term plan is to replace all bridges over Tice Creek on both courses; Ann Mottola, RWC’s director of community services, told the Board Thursday that these two bridges have been the ones most compromised by creek bank erosion, flooding and other factors.
The 6-0 unanimous vote reflected the absences Thursday of members Leanne Hamaji and Roy Yang, and the permanent departure of longtime Board member Dwight Walker, who has moved from the area. Board member Susan Hildreth suggested closing Thursday’s meeting in honor of Walker, whose second Board term was ending this spring. A former three-time president, he also had served on several RWC committees, most recently as chairman of the Planning Committee.
In a related note, the Board voted 6-0 Thursday to name Hamaji to fill Walker’s vacancy on the Planning Committee, and to name Janet Seldon its chair.
Fitness Center skylight Also on Thursday, the Board voted to spend up to $28,360 to replace the skylights at Tice Creek Fitness Center. The existing skylights are well beyond their estimated 20-year lifespan and are at risk of leaking or other failures.
The project has been on the RWC capital projects list since 2024. Flynn Architecture, which has done other work at the Fitness Center, will do the skylight project.
At the March 12 Planning Committee meeting, Mottola said it’s hard to tell how much work will be connected to the skylight project until the existing skylights are disassembled, but she noted that the work shouldn’t cause any significant disruptions to activities inside the gym.
Objection to Gateway, Dollar study Seven residents told the
Board they want the Rossmoor Library to remain where it is, in the Gateway Clubhouse building (also known as building “C”), and not moved to the nearby Multipurpose Rooms ‒ or anywhere else ‒ as part of any proposal to consolidate RWC and RPM workers in newly created offices at an overhauled Gateway.
“It’s clearly an unpopular idea,” said Kathleen Odne, adding that she and her husband have heard criticism of the very preliminary plan from fellow residents everywhere from golfing partners to fellow excursionists. “Keep (the library) where it is.”
Gisele Huff suggested the 4,000-some Rossmoor Library cardholders should vote on any prospective library move.
Odne, Huff and five others addressed the Board Thursday. Seventeen speakers did so to the Board in February, and others have spoken at other RWC meetings.
Rossmoor General Manager Jeff Matheson addressed the controversy in his GM’s report Thursday. He told the audience RWC is “evaluating options,” and that no decisions have yet been made about moving anything anywhere. The Board hired the firm ELS Architecture and Urban Design to analyze a preliminary plan to renovate Dollar to create more club meeting space for groups now meeting in Gateway’s Multipurpose Rooms. Those MPR areas would then become home for Rossmoor’s Library and Computer Center, with the Redwood Room functions now in the Gateway clubhouse moving to Dollar. But Matheson said any such proposal is extremely preliminary.
“We’re investigating options, and it’s the beginning of a long process,” Matheson told the Board and the audience. Concepts on paper now, he added, will almost surely change. A website laying out all current and background information is expected to be unveiled in coming weeks, he added.