Board wants to ‘investigate’ proposed renovations to Gateway, Dollar House
Possibility of moving library, computer center, Redwood Room upsets residents
By Sam RichardsStaff writer
In print on pages 1A, 14A and 15A

Despite a flurry of complaints from residents to the RWC Board about preliminary plans to consolidate RWC and RPM offices at Gateway, the Board on Thursday voted to pay an architecture firm up to $157,000 to study proposed renovations to Gateway’s main clubhouse and multipurpose rooms and Dollar House.
The architect, ELS Architecture and Urban Design, based in Berkeley, will be asked to do the “design development phase” for both Gateway and Dollar. ELS helped create RWC’s Facilities Master Plan, adopted in 2022, and is also project architect for the new pickleball building.
The plan now – very preliminary, subject to minor or major modifications – would renovate Dollar to create more club meeting space for groups now meeting in Gateway’s multipurpose rooms.
Those MPR areas would then become home for Rossmoor’s library, computer center and Redwood Room, now in the Gateway clubhouse.
The vacated Gateway clubhouse space then would be renovated into consolidated RWC and RPM administrative offices, with one centralized help desk for residents.
While renovations to and refurbishment of Gateway have been heralded by some Board members and other residents, the idea to turn most of the Gateway clubhouse (Building C) into RWC administration offices met with fierce resistance from residents, many of them Library supporters, who filled Peacock Hall. Seventeen people spoke to the Board on this topic during the meeting’s Members Forum period, all of them opposed to major changes at Gateway.
Resident Gisele Huff called the preliminary plan an “upheaval.”
“This entire charade is in the exclusive service of RWC, and residents be damned,” she said. She was the first of several people to say the proposed changes would benefit RWC and RPM staff more than residents. “I’m sorry your current administrative setup is inconvenient, but you work for us!”
Many of Thursday’s speakers singled out the Rossmoor Library as something that shouldn’t be moved, shrunken or otherwise messed with.
“That’s a sacred space where Rossmoor residents gather,” and has more than 4,000 active patrons, said Joann Lockyer, a library volunteer. Ed Bell said he’s spoken with 30 or more fellow residents about the preliminary relocation plans, and that none of them support the idea. “We like the Gateway Center the way it is,” he said.
Other speakers also urged the Board to delay approval of the study at least until after the Friday, March 6 Town Hall meeting, where this multiphase plan will be discussed. “I’m hoping for a two-way conversation on March 6,” Ron Frazzini told the Board. Board member Roy Yang also asked that approval of any study be postponed until after the Town Hall session.
Other Board members, however, were quick to point out that one purpose for the study is to help determine what the options are, and which options are practical.
“This is investigative work that has to be done,” Board member Ted Bentley said. “If we don’t do this, we would be doing Rossmoor a disservice.”
Board members pointed out that several other locations, including the current Rockview site and property outside the gate, have been considered in similar studies and were ultimately rejected after reviews by ELS.
The Board approved the study 8-1, with Yang voting “no.” The $157,000 is being paid from a reserve created when the last attempted sale of the RWC-owned former John Muir Health clinic fell out of escrow.
Whatever renovations eventually take place will be paid for from proceeds from the sale of that property at 1220 Rossmoor Parkway. Matheson said the former clinic is now once again in escrow, with its sale pending. He stressed that the renovation work will not add any costs to residents’ monthly coupon.

Redesigned MyRossmoor.com Ann Peterson, Rossmoor’s director of communications, said the revamped MyRossmoor.com website is scheduled to launch Wednesday, April 15. Similarly, a retooled Rossmoor.com is set to debut on May 1.
The new MyRossmoor.com, Peterson said, is being created entirely with Rossmoor residents in mind; the new Rossmoor.com will be focused on outsiders considering moving here.
MyRossmoor.com is being designed with easier-to-use menus, tools and search features. A key goal, she said, will be the ability to access any page on the site with three or fewer mouse clicks. Allowing Mutual leaders to better access and control official Mutual documents will be another highlight of MyRossmoor, Peterson said.
Phase I, she said, will also include online access for residents to manage their guest list and issue gate passes for visitors through a password-protected third-party platform called DwellingLive. Phase II, with discussions scheduled to kick off in June, will include the capability for Mutuals and clubs to create their own “micro-websites,” through the FluentCommunity social platform. Phase III, which will likely come late this year or in early 2027, will include enabling residents to reserve golf tee times, buy event tickets, manage gate passes for visitors, and perform other functions through Vermont Systems, an outside provider. The latter will include an app.
The Board also approved bringing in dedicated customer service support to assist residents for six months as they register, log in and begin navigating in DwellingLive. Director of Public Safety Tom Cashion emphasized that residents can still call or go to the Public Safety Office to manage their guest lists and visitors; the online feature will just be an added convenience.
MyRossmoor, redesigned in-house by Javier Roman, RWC’s web content manager, has incorporated several resident suggestions over the past eight months, and Peterson has given several presentations on the most up-to-date iteration of the new website over the past few weeks.
In August 2025, the Board approved spending about $151,000 on several actions to improve both the Rossmoor.com and MyRossmoor.com websites to better serve current residents’ needs. Rossmoor.com is being created by an outside company to include detailed information about amenities, services and homes in Rossmoor, local real estate agents, and other information that could appeal to people checking out Rossmoor as a potential home. Some resident services now accessed through Rossmoor.com will migrate to MyRossmoor as part of the overhauls of both sites.
‘Short-range’ transportation plan The Board on Thursday unanimously approved seeking a consulting firm to do a comprehensive study of Rossmoor’s transit operations, to help Rossmoor leaders determine what measures can, and shouldn’t, be taken to provide the best level of service possible for residents.
The plan is for RWC to send “requests for proposals” (RFPs) to pre-selected potential consulting firms by April 1, with responses due by May 30. It is hoped that a consultant could be chosen by late July. Those responses would be evaluated starting June 1, with final recommendation of a consultant to be considered by the RWC Board at its July meeting.
The actual work would begin in early September.
As part of the RFP, the chosen consultant would be asked to evaluate ridership patterns and the ridership volume to various locations; conduct surveys of onboard ridership; host workshops; and administer online and physical community surveys to evaluate residents’ wants and needs. As Matheson said, the hope is for this study to “help us reimagine transportation service” that Rossmoor can provide its residents.
Ridership, once quite robust, has never rebounded after the COVID-related shutdowns of the early 2020s. Fixed-route bus service is gone, with RWC providing only Dial-A-Ride service.
Current challenges to increasing service, according to a RWC staff report, include restoring rider interest and confidence; finding dispatch software that matches the desired future level of service; and recruiting and retaining bus drivers, which has been a challenge ever since the pandemic shutdowns.
Matheson said the hope is that a consultant’s effort can show how RWC can convince riders who have other transportation options to also use Rossmoor’s transportation.
Rossmoor sent out similar RFPs a few years ago but had no takers, and no study was done. Matheson said Rossmoor is willing to pay more this time around, which he hopes will attract some interested firms.