GM’s Report
Join Me for a Town Hall Presentation
By Jeff Matheson,RWC General Manager
In print on page 9A
Please join me on Friday, March 6 at 10 a.m. at the Event Center for a Town Hall presentation focused on planning for major capital improvements. The presentation will focus on projects scheduled to begin with the planning process in 2026. Specifically, the presentation will focus on:
• Dollar House
• The Multipurpose Rooms at Gateway
• Gateway Buildings B and C
• Food and Beverage Service
• Hillside Outdoor Amenities
Dollar House
The Dollar House is on the National Registry of Historic Places. The house was originally constructed in 1933. It was converted from a home to a clubhouse in the mid-1960s. Over the years, there have been minor improvements; however, the house needs significant renovation.
Renovations will improve access to the second floor, focus on creating spaces for small meeting rooms, creating spaces for social gatherings, and a lounge-style atmosphere with both indoor and outdoor connections, food and beverage service, and improved restrooms. Renovations would be in compliance with historical building codes and strive to maintain the character and appeal of the historic house. Renovations of the Dollar House, focusing on meeting rooms and lounge space, will allow a transformation of the existing Multipurpose Rooms at Gateway.
Multipurpose Rooms
The Multipurpose Rooms at Gateway provide the ideal meeting space for many smallto medium-sized functions. These functions can be served in the new spaces created at the Dollar House. This will allow the Multipurpose Rooms to be transformed into a new Rossmoor Library and Computer Center.
These two vital amenities would be modernized to meet the needs and interests of the community. Under the leadership of two very dedicated clubs and numerous volunteers, these amenities have thrived at Gateway. Creating new spaces in coordination with these clubs’ input will help ensure that the Library and Computer Center continue to be integrated into the Gateway Complex. Relocating the Library and Computer Center provides space to transform Gateway Buildings B and C into new administrative offices for both RWC and RPM as well as add amenities such as a central boardroom and food and beverage services.
Gateway Buildings B and C
Gateway buildings B and C include the main building close to the parking lot and the current admin building housing Recreation, the Board Office and Member Records. The Oak Room would remain in place. Once the Library and Computer Center are relocated, the buildings can be transformed into new administrative offices for RWC and RPM. This would allow for the creation of a central customer service desk to meet resident needs.
It would also improve the overall accommodations for RPM and Accounting, which are currently housed at 800 Rockview Drive, which is the Corporation Services Yard. Currently, many departments have staff split between Gateway and RPM, which is not conducive to productive workflow. Renovation of this space would also include the creation of a new Board Room where all Mutual board and RWC meetings can be scheduled. This, in turn, frees up space at other clubhouses where meetings are currently scheduled. The renovation of the space would also include the addition of a small café providing expanded food and beverage services.
This is just the beginning of the planning process for these major Rossmoor amenities. Please remember that plans may evolve as the process progresses. As we work through the design process, there will be input from working groups, committees and residents that will guide the final designs. Over the next several months, the process will unfold. Once final designs are approved, the consultants will begin preparation of construction drawings and complete permitting. This is a long journey that will be completed in phases.
Funding for capital projects comes from the Membership Transfer Fee and is not part of the operating budget (coupon). An overview of how these projects will be funded will be presented at the Town Hall.
Employee Transitions
No new employees commenced in the month of January.
One employee left employment with the RWC in January: Hideyo Routh, Head Lifeguard, Aquatics.