Rossmoor News, Wednesday, August 27, 2025, page 9A
Stories on this page, to read as text
The page as printed
Rossmoor News • August 27, 2025 9A
WWW.MARTHASSENIORGOURMET.COM 800-621-8966
FRESH MEALS FOR SENIORS. DELIVERED N V
Nutritionally balanced
Variety, Flexibility
Low Sodium No Commitment
RENAL, DIABETIC, CHF & MORE
Valley
AUDIOLOGY
BETTER HEARING
FOR SUMMER?
Sounds like fun!
Improving your hearing will make every
campout, cookout and conversation
extra enjoyable.
www.valleyaudiology.com 1872 Tice Valley Blvd., Walnut Creek, CA 94595
Call to schedule a hearing checkup!
(925) 270-4552
GM’s Report
By Jeff Matheson, RWC General Manager
RWC Property Outside the Gate
Rossmoor Walnut Creek (RWC) owns property outside the gates at 1220 Rossmoor Parkway. The parcel housed what is often referred to as the Medical Center. When Rossmoor first opened, it included medical services. The community later made the decision to move away from medical services, and the property was leased to John Muir Medical, which operated out of the facility until 2019. In 2019 the RWC Board hired Collier International to assist in the evaluation of market opportunities to either lease the building to a new tenant or sell the property. Based on the estimated costs
Rossmoor Property Management (RPM). The current offices are located at 800 Rockview Drive. The office building houses Accounting, Human Resources, Building Maintenance, Information Technology, Work Order Desk, Resales and Alterations, RWC Maintenance, Landscaping, the Public Safety Manager, and Administration. The office space is a converted warehouse and is in poor condition. Over its history it has been reconfigured several times to try and squeeze every square inch of usable space.
An option to replace the offices at 800 Rockview was to relocate to the 1220 property. This would also address another challenge. RWC has office space at Gateway and Rockview. Several departments have staff split between two locations. This makes it more difficult for cohesive work environments but also makes it more difficult for residents and guests to know where to go to receive the services they need.
Relocating all RWC and RPM offices to 1220 would have created a “one stop shop” for services. This would also open space at Gateway for new programing.
The Board worked with the firm of ELS Architectural Services to evaluate the property at 1220 and to conduct some space analysis to determine if the existing building could accommodate all the needed space. Based on the evaluation it was determined that the cost of renovations would exceed the value of the project. Based on this conclusion other options have been explored for the replacement of RWC/RPM offices. This included an evaluation of the current location of Rockview as well as the option to acquire a new property outside the gates.
The RWC Board has given authority to Colliers International to once again list the property at 1220 for sale. They have also authorized Colliers to investigate oppor
tunities for the acquisition of new property for a potential new home for RWC/RPM. The timing of a sale and acquisition is important as there is an opportunity to save significant tax liability with a 1031 exchange process. There are many steps in the process. Many of these steps will take place in executive session as topics of real estate transactions need to be kept confidential as negotiations are ongoing. The Board and staff are committed to transparency and will continue to share progress throughout the due diligence process as permissible.
Employee transitions In July, one employee commenced employment with the RWC: Sonia Coleman, Administrative Assistant, Executive Services.
Two employees left employment with the RWC in July: Clayton Clark, Sr. Bldg. Maintenance Manager, Building Maintenance; and Sonia Coleman, Administrative Assistant, Executive Services.
involved in renovations, and the lack of demand for a 1970s building, it was decided by the then-Board of Directors to sell the property.
Interest in the property was strong based on zoning that permits assisted living community as a permitted use. Unfortunately, the pandemic and subsequent market conditions wiped out options to sell. The RWC Board then decided to take the property off the market for further consideration.
In 2022 the RWC Board adopted a Facilities Master Plan (FMP). Through a lengthy public process, the Board identified the top capital projects over the next 10 years. The main project identified was the need to replace the administrative offices for
By News staff
The Contra Costa Transportation Authority (CCTA) has launched a 3-D online open house detailing its 2050 Countywide Transportation Plan and is asking residents to take a 5-minute survey to rank their priorities and enter a drawing for gift-card prizes.
The open house allows
residents to virtually “walk” through various concepts being considered for the plan, including bike boulevards, transit improvements, express bus lanes and greener, safer streets, according to a news release from CCTA.
Visit https://openhouse.ccta.net to access the open house and survey, which are live through Sept. 30.
CCTA launches online open house
Fire? Emergency? Call 911.



