Rossmoor News, Wednesday, October 2, 2024, page 2A
Stories on this page, to read as text
The page as printed
2A Rossmoor News • October 2, 2024
guidewaylegal.com
925 Ygnacio Valley Rd., Ste 204 • Walnut Creek
BOARD: Operations budget to total $28.4 million next year
Continued from page 1A
Photo by Dan Rosenstrauch GRF Board President Leanne Hamaji looks over a section of the 2025 budget during its monthly meeting in Peacock Hall at Gateway last week.
TIMELY APPOINTMENTS ARE AVAILABLE. CALL US TODAY!
Check www.goldenstatedermatology.com for Additional Locations
VISIT OUR NEW ROSSMOOR LOCATION!
in the Rossmoor Shopping Center
We specialize in medical conditions of the skin, hair and nails, Mohs micrographic surgery for the treatment of skin cancer as well as surgical and non surgical cosmetic skincare and anti-aging. We are committed to providing excellent and personalized care to all our patients.
1914 Tice Valley Blvd. • Walnut Creek, CA 94595 Our Rossmoor Dermatologist Daniel J. Aires MD, JD, FAAD 925-357-9786
BOOK ONLINE 3344 Mt. Diablo Blvd. Lafayette, CA 925-284-4440
www.LamorindaFloors.com
License #708486
LAMORINDA FLOORS
Family Owned
Business Since 1989
• CARPET • HARDWOOD • RUGS • LINOLEUM • TILE
www.macymovers.com FULL SERVICE MOVING & STORAGE
510.444.0100 ■
SINCE 1915
budget. And all but about $17,200 was indeed found in other parts of the operational budget, including converting the current golf course superintendent position from a full-time job to a three-quarter-time one; eliminating an off-site GRF Board retreat; cutting by half proposed travel costs of a Board trip to the Laguna Woods community in Southern California; and increasing the Facilities Use Fee (FUF) from $70 to $112.
The FUF is paid by residents living in a Rossmoor manor they lease from its owner. The fee, applying to each person living in a leased manor, pays for their prospective use of Rossmoor amenities in the way resident owners pay for amenities through the monthly coupon.
The largest individual department budgets for 2025 were general services (and unallocated), at $4,908,315, about 0.8% less than in 2024: public safety/Securitas, $2,454,776, up about 0.9%; Custodial Services, $2,000,261, up almost 1%; Recreation, $1,368,458, up 0.56%; and the golf courses, $1,349,886, down about 0.22% from 2024. The GRF operations budget
is distinct from GRF’s capital projects budget, which will be determined later this year or in early 2025. That budget includes major construction projects and related expenses.
With the setting of the 2025 GRF portion of the monthly coupon, each Rossmoor Mutual board will now work in earnest to craft the Mutuals’ share of the monthly coupon. Those should all be established before the end of December.
MOD budget approval The Mutual Operations
Department (MOD), its budgets in past years approved on a different timeline from that of the GRF operating budget, has changed its cycle to align with the operating budget finalization. And so it was that on Thursday, the GRF Board unanimously approved a $13,060,439 MOD budget for 2025, 3.8% less than the 2024 budget.
“This budget represents what it takes to deliver the services the Mutuals need on an ongoing basis,” Matheson told the Board Thursday. He
said the approved MOD budget is essentially a break-even budget.
Different kind of
transit study The Board on Thursday approved up to $15,000 for a Short-Range Transit Plan
of what steps to take next, considering that demand for Rossmoor buses has remained significantly down from preCOVID times. Matheson said he hopes that study will be available to the GRF Planning Committee in January.
study aimed at helping determine what kind of GRF-operated bus service residents want. It’s likely going to be a different kind of report from the one Board members thought they would see when, several months ago, they approved spending up to $40,000 for such a study.
Matheson said that when GRF issued a request for proposals to consulting firms for such a study, and only one firm even replied, it was time to reevaluate what that study should be. He envisions the work now as more of an overview of “microtransit” in general, which he hopes can provide a better plan
Generator replacement Also Thursday, the Board approved spending $60,000 for replacement of the emergency generator near the entry gate, and the needed excavation work to install it.
During recent power outages affecting the Entrance Control Facility (entry gate), the generator has failed to start automatically, rendering gate personnel unable to communicate with, or be reached by, residents for extended periods of time.
Separately, a staff report says, the generator has experienced more frequent failures, and neither GRF crews nor outside vendors have been able to fully repair it.
“This (MOD) budget represents
what it takes to deliver the services the Mutuals need on
an ongoing basis.” – General Manager Jeff Matheson
Photos on this page
- Leanne Hamaji, GRF Board President, reads a document at a laptop during a board meeting. Caption: GRF Board President Leanne Hamaji looks over a section of the 2025 budget during its monthly meeting in Peacock Hall at Gateway last week.



