Rossmoor News, November 22, 2023

WHAT HAS HAPPENED TO FITNESS CENTER AND POOL?

Jan HowardRunning Springs Road

In print on page 24A

The new $10 million Fitness Center was completed in 2018. It was beautiful. I was proud of it. I swam there every day until COVID closed it in 2020.

After the pool reopened when COVID cases lessened, I did not return until recently. I was showing a friend, who is considering becoming a resident of Rossmoor, the gym, locker room and pool area.

We noticed that the glass ceiling over the pool was open. It was a cold day. I asked why it was open. I was told that it has been broken for many months and probably won’t be fixed until spring. Are residents expected to swim in freezing winter weather without the ceiling? How about when it is raining and storming out? That will all come into the pool.

I would like to know why it is not being repaired now.

Next, we went into the locker room. I was so embarrassed and shocked by the deplorable condition of the showers. The shower floors are rusting near the drains. The walls and ceilings are bubbling, peeling and coming off in sheets. The metal strips in the ceiling are extremely rusted. Is any maintenance being done in the locker room?

What kind of budget has been set up to make sure that the locker room, gym and pool stay in good shape? How can a $10 million dollar gym, pool and locker room look so bad in a few short years?

I would like to have my questions answered.

Editor’s note: As of press time, we did not yet have answers to all the questions, but Community Services Director Ann Mottola said she hopes to have an article in the News soon that will address these issues.