Rossmoor News, October 25, 2023

Hillside repairs

In print on page 15A

A tractor works a bare, freshly graded slope on a hillside at Dollar Course.
A tractor works the hillside at Hole No. 5 at Dollar Course which came down after the severe rain from last winter.News photos by Dan Rosenstrauch
A worker sprays water on a slope while a backhoe works the hillside at Hole No. 5.
A worker sprays water on the hillside along Hole No. 5 on Dollar Course that is being repaired after the heavy rain from last winter caused it to slide.