Issue

Page 2A

Page 2A

Rossmoor News, Wednesday, March 8, 2023, page 2A

Stories on this page, to read as text

The page as printed

2A Rossmoor News • March 8, 2023

The Rossmoor News (927080), established April 15, 1965, is published every Wednesday for Rossmoor residents and is available outside of the community at a subscription rate of $55 per year (for second-class mail delivery), by Golden Rain Foundation, 1006 Stanley Dollar Drive, Walnut Creek, CA 94595. Periodical postage is paid in Walnut Creek, CA. POSTMASTER: Send address changes to the Rossmoor News, 1006 Stanley Dollar Dr., Walnut Creek, CA 94595.

Rossmoor News

DEADLINES:

• Tuesday at 3 p.m. - columns • Wednesday at noon – Religion notices, movies and Club Trips • Thursday at noon – press releases, club news and event announcements • Thursday at 2 p.m. – Obituaries • Thursday at 3 p.m. – Display and classified ads, and letters to the Residents Forum. Early deadlines due to holidays are announced in the News. The Rossmoor News is legally adjudicated to publish legal notices and fictitious business name statements. The News reserves the right to reject or discontinue advertisements or articles that the manager deems unsuitable, including those with affiliations with criminals, criminal enterprises, terrorist organizations or those who encourage or affiliate with such parties or promote such activities. All articles are subject to editing.

TELEPHONE: General information and display and classified

advertising: 1-925-988-7800 Fax: 1-925-988-7862 MISSED PAPER: Report missed papers by Thursday noon.

Call 1-925-988-7800 and give complete address with entry. ADDRESS: 1006 Stanley Dollar Drive, Walnut Creek, CA 94595 OFFICE HOURS: Monday through Friday, 8 a.m. to 4 p.m., closed 12-1 p.m. E-MAIL ADDRESS: news@rossmoor.com. News articles and

letters to the editor can be emailed to: news@rossmoor.com. Classified ads and payment information can be emailed to newsdesk@rossmoor.com. Articles and ads cannot be submitted through the website. All emailed ads and articles will receive a confirmation from News staff. WEBSITE: www.rossmoor.com and www.rossmoornews.com STAFF: Ann Peterson, Managing Editor Editorial: Chrissa Basbas, Editor/Administrative Assistant; Craig Lazzeretti, Assistant Managing Editor; Sam Richards, David Scholz and Mike Wood, Staff Writer/Editors Production: Kerry Curran, Celeste Fitzsimmons, Chris Wagnon, Production and Graphic Specialists Dan Rosenstrauch, Photographer Display Advertising: Cheryl Dillard, 1-925-988-7811, Account Representative; Trisha Engelmann, 1-925-988-7809, Account Representative Office: Claudia Marlatte, Administrative Assistant, classified and legal advertising, 1-925-988-7800. Contributing Writers: Various writers from Democrats of Rossmoor, Progressive View and from Republican Club, Republican Perspective; Gene Gordon, Shakespeare Revived; Bill Leary, Engaging Saging; Robert Moon, Modern Classical CDs; various writers of Sustainable Rossmoor, Earth Matters; Jane Viator, Collector’s Corner; Eleanor Vincent, The Bright Side Proofreaders: Judie Huse and Marilyn Allen

• Floors • Counters • Cabinets • Window Coverings

Offering luxury brands to help make

your house a home

Call today for a free in-home

consultation

2001 Crow Canyon Rd., Ste. 110 • San Ramon www.homesiteservices.net

Karin Frey, Designer/Contractor 925-356-1057

Hillside instability behind Singingwood gets in way of projects

Workers clear tree branches at the top of Singingwood Court after cutting down trees on a hill damaged by recent rains.

News photos by Ann Peterson A large crack forms in the hillside above Singingwood Court after recent rain.

Workers clear tree branches that were cut away to allow plastic to be draped over a hillside above Singingwood Court.

By Mike Wood Staff writer

As work continues to protect homes from effects of the weather over the long haul, short-term impacts keeps getting in the way.

That’s the dilemma workers have faced in a project to replace a retaining wall to buffer manors facing a hillside near the end of Singingwood Court, which had been planned well before all this winter’s drenching rains hit.

A chunk of the hillside that faces a southwestern sector of Singingwood fractured when rains hit at the end of February, providing a visual similar to a fissure caused by an earthquake. It temporarily delayed the project by contractor AcuStruct Inc. for Second Mutual.

Landscape Field Supervisor Eddy Ibarra and his crew

helped shore up the hillside Feb. 28 while rains continued off and on, clearing two small trees and some scrubs from the affected area so they could place plastic covering

to protect the area from more drenching. He was hoping for a reprieve from the rain so things could stabilize.

Ibarra said the crew was also dealing with another troublesome slide near Skycrest Drive. They have been attending to slide after slide since the long series of heavy rains that started around the new year.

“You can’t do anything because everything is super wet,” Ibarra said.

Building Maintenance Project Manager Eric Howard said the new retaining wall at Singingwood will be 208 feet long and range from 2 to 4 feet in height. It will be a vast upgrade from the old wall that was deteriorating, he said.

Built in the late 1970s, the old wall was made of stacked concrete blocks, he said. The new wall will consist of tiers

that will be 13 feet deep with concrete grade beams and concrete rebar.

It’s a matter of getting the ground to stabilize to get jobs like these completed.

“This winter has just been unreal,” Howard said, adding that the impact of the mudslides is unlike anything he’s seen in 15 years working in Rossmoor. “It’s become a little challenging, but the contrac-

tors are working diligently.”

Mudslides have caused issues at multiple spots in Rossmoor, including putting three holes on Dollar Golf Course out of commission for a short time and causing Hole 3 to be modified into a smaller configuration for the time being. Dealing with a lot of clay and sandstone is problematic with hillside slides, Ibarra said.

Photos on this page

  • Workers in high-visibility vests and rain gear load cut tree branches into a dump truck at the top of Singingwood Court. Caption: Workers clear tree branches at the top of Singingwood Court after cutting down trees on a hill damaged by recent rains.
  • A steep hillside above Singingwood Court with a long orange safety fence and a deep crack running across the slope beneath a tree. Caption: A large crack forms in the hillside above Singingwood Court after recent rain.
  • Workers in rain gear clear tree branches from a muddy slope covered partly with white plastic sheeting above Singingwood Court. Caption: Workers clear tree branches that were cut away to allow plastic to be draped over a hillside above Singingwood Court.