GRF NEWS
A list of notable projects under Tim O’Keefe’s leadership
By GRF Executive Services

These are a few of the more notable projects and accomplishments that occurred since Tim O’Keefe began his tenure as CEO in mid-November 2015. To see the full list, go online at https://tinyurl.com/5n6bn9e7:


2015: • $850k capital budget passed, including $120,000 for indoor pool ultraviolet system 2016: • $10 million secured for Fitness Center renovation project scope • Creekside Grill lease negotiations completed with annual $22,000 increase (20%-plus) in rent/utilities • $22 million Comcast agreement negotiations completed: $175 retail value for $55 with community savings of $48,067,200 over 5 years • First Home Show Vendor Fair held • Traffic and pedestrian safety study commenced • Directional signs installed at Gateway for first responders • 3-year, $5.5 million Securitas renewal negotiated • Tour of bus routes completed and improvements to Gateway bus shelter implemented • Dollar Accessibility Study concluded • Hillside atrium renovation completed • Nixle emergency communication system acquired • Computer/photo clubs recruited to conduct workshops and seminars for community-wide broadband internet rollout • Fitness Center construction drawings approved • Concept of Facility Master Plan introduced to Board • Power purchase agreement executed for solar farm, with estimated $5 million savings over 25 years • Gateway Multipurpose Room renovations completed • Trust tax issue resolved, new tax ID acquired 2017: • Analysis of financial impact of disaster scenarios completed; $25 million earthquake insurance secured • Roll-out of Comcast cable TV and broadband equipment completed • First phase of online room and excursion availability set up for Recreation Department • Roll-out of Nixle emergency notification system commenced • 20-year Long Range Capital Needs Analysis completed • Budget and contractor for Fitness Center renovation approved • Wi-Fi installed in studios, multipurpose rooms and Table Tennis building • Restroom shuttle on Creekside course installed • Grand opening of new home for pickleball held at Creekside courts • New projector and screen installed in Peacock Hall • Draft of traffic and pedestrian safety study presented • New phone system installed • First Risk Management (Safety) Committee meeting held • Incident Command System introduced to management • Landslide repairs on Dollar golf course completed • City persuaded to repave Rossmoor Parkway to Tice Valley Road • DocuSign implemented to improve efficiency with Mutual directors • Dollar trellises rebuilt • New Redwood Room food service vendor contract negotiated • Ad hoc Technology Planning Committee formed • Planning Committee formed • Landscape plan negotiated with City for medians outside gate on Rossmoor Parkway • New sliding entrance doors installed at Gateway • Drop Creek structure replacement completed • Phase II of golf cart path replacement completed • Replastering of Del Valle pools completed, pump/heater/decking replaced and UV filtration system installed; pools re-opened • Workers compensation claims reduced by 27% and costs by 96% compared to 2015 • 386,000 square feet of asphalt replacement (9,700 tons) and 150,000 square feet of asphalt seal coat completed • First year of supervisor training program concluded 2018: • Renovation of Fitness Center completed • Preliminary exploration of water recycling facility completed • Restroom at 16th green and Dollar Clubhouse rebuilt • Modifications to Fitness Center locker rooms authorized • Turf medians replaced with new irrigation and drought tolerant landscaping on Rossmoor Parkway outside the gate • SiPass access control system activated at Fitness Center • $63,000 Measure J grant funding received for On Demand bus service • 3-year, $131,000 program authorized to develop, pilot and operate On Demand bus service • Authorized $222k creek repair design work • Contra Costa County Fire Protection Chief presentation hosted on wildfire risk and evacuation • Hillside renovations, including new acoustical panels and flooring, completed • Kitchen ceiling piping replaced at Hillside • 10 EV chargers each installed at Gateway, Event Center/ Dollar and Fitness Center • Safety improvements implemented at Oakmont, Rossmoor Parkway and Golden Rain Road, including moving crosswalks, installing flashing beacons/signs and expanding red curb zones • Bar code readers replaced with RFID readers at gate • PG&E presented fire mitigation plan and community information workshop • New Resident Orientation Program completely overhauled • New employee benefit package negotiated, reducing budget by $86,680 • Garden Center renovations completed, including new roadway, gate, electrical, plumbing and sewage lines and restroom • Landscape island removed on Stanley Dollar Drive to install four new parking spaces • New 2-tiered RV space rental rates with annual escalator established • Final design for Gateway Studios remodel approved • New 3-year lease agreement negotiated for Redwood Room café operator • Simbli implementation completed for Board packets 2019: • Rossmoor.com website redesigned • Board meetings begin being posted on YouTube • Water reclamation feasibility study received • Ad hoc Tech Committee completed its recommendations • First capital needs analysis completed • Replacement recycling service for e-waste secured • Collaboration with CCTA authorized on $10 million autonomous shuttle grant • Employee recycling program introduced • Installation completed of MOD IT generator for computers and phone system • Membership Transfer Fee increased to $10,000 • New Whistleblower Policy approved • Recycle Smart rolled out organic recycling program in Mutuals • Charter for TV/Internet task force survey approved • Ride sharing subsidy ($10,000) for Uber/Lyft approved • Riparian rights to creek obtained • LED/energy efficiency program with Enovity approved • Broker hired and negotiations began with John Muir Medical Center lease set to expire March 2020 • Funding for web portal ($50,000) approved • Acalanes/PG&E vegetation maintenance improvement around power poles advocated for • E-Edition of Rossmoor News and new rossmoornews.com website rolled out • Redwood Room café opened • New mission, vision and value statements for GRF adopted • 2-year Comcast contract extension negotiated to include Turner Classic Movies and Sports package for additional $20.5 million savings • New Online Privacy Policy adopted • Lower RV lot repaved • PG&E persuaded to replace the power pole at entry 15 on Golden Rain Road • Dollar Clubhouse accessibility improvements to front and back completed • First draft of updated Emergency Operations Plan for wildfire, disaster and evacuation planning presented • Organic recycling program implemented in clubhouses • New phone service vendor (Comcast) obtained with estimated annual savings of $106,000 • New copier service obtained with estimated annual savings of $28,000 • Installation of 1 megawatt solar farm completed • Fiber optic cable installation completed 2020: • Updated Emergency Operations Plan finalized • Facilities locked down on March 17 because of COVID; all departments, services and programming redesigned multiple times during the month due to changing public health orders • ChoiceLunch food delivery service secured; Creekside Grill’s and Kairi’s Kitchen’s re-opened for take-out • Zoom video communications acquired to provide teleconferencing capabilities • Non-essential operational and capital spending suspended • COVID safety signage ordered for front gate at recommendation of public health officials • Rossmoor News redesigned with new entertainment and informational resources • Fitness trainers and golf pro staff prepared series of training videos for residents • Recreation staff created new online programs and classes for residents • $3.57 million forgivable loan secured from the federal Paycheck Protection Program • Employee handbook updated • Permanent utility easement for PG&E authorized in exchange for $4,500 • $615,000 approved for replacement of Gateway HVAC • Retention approved of registered forester to apply for California Forest Improvement Program grant • Guidelines adopted for COVID-related decisions • $175,000 approved for next phase of water reclamation • First Enterprise Risk Management schedule reviewed • All Channel 28 programs backed up to cloud storage • Purple Air sensors installed outdoors at Hillside and Dollar pools and indoors at Gateway, MOD and the Golf Shop • New (anti) harassment policy approved • $250,000 approved for ventilation system upgrades to improve air quality in GRF facilities and $250,000 for needlepoint ionization upgrade to HVAC • ADA renovations to Hillside restrooms completed • Creek repairs at Buckeye and Creekside completed • $1.2 million LED and energy efficiency upgrades completed for street lights, facility lights and heating/ cooling systems at Gateway and MOD with no-interest PG&E loan • New enforcement policy, procedure and rule and new demonstration policy approved 2021: • New web portal activated • Rossmoor Election Media Access policy revised • Contractor for plans for Creekside pickleball complex approved • John Muir and Kaiser recruited to distribute COVID vaccines in Rossmoor • ABD Retirement Services hired as new advisor for pension and 401k • Redwood Room redesigned • $150,000 approved for master planning consultant • Forgiveness obtained for $3.57 million PPP loan • $839k contract approved for Gateway Studios remodel • Business resumption plan completed • Sale agreement for the Medical Center executed • $2 million errors and omissions and $3 million environmental insurance policies obtained • 10-year Power Purchase Agreement authorized for phase II solar • First Diversity Festival held • Evacuation zones defined in Rossmoor and safety cards distributed to all Rossmoor homes • Emergency BBQ fire safety order implemented • Agreement reached with union on new collective bargaining agreement • Comcast waived their improperly noticed 2022 rate increase, saving $176,000, and were also convinced to waive their 2020 Sports Entertainment Package fee, saving an additional $176,000. • 3-year extension of Active Wellness contract at Fitness Center authorized 2022: • Forest Management Plan for wildfire mitigation completed • Public Safety Manager position expanded • Hillside Pool replastered • Food trucks and Night Market on the Plaza debut at Gateway • ConFire grant application supported for wildfire mitigation • New 4-year labor agreement negotiated and executed • Channel 28 rebranded to Rossmoor Television as it debuted a livestream and Video on Demand. • Evacuation drill held in Rossmoor • Membership Transfer Fee increased to $12,000 • Agreement entered into for new bus On Demand software • Website ADA compliance completed • Civility Task Force created • Easement for Rossmoor Parkway Court executed to clear title for sale of medical center • ConFire awarded $3M grant for wildfire mitigation, mostly on GRF property • Sound study and design work authorized for pickleball complex near Event Center • $3.6 million of 2021 GRF and MOD surpluses distributed to the Mutuals • First phase of access control launched at the front gate and MOD • Facilities Master Plan approved • Dollar/Event Center tree care program approved • CEO search firm hired • CBIZ retained to conduct 2023 internal control audit for $41,000 • Golf maintenance yard approved as site of proposed satellite water recycling facility • Phase II of median lawn conversion plan approved • Partnership approved with Walnut Creek Police to expand traffic enforcement hours • Co-location set up in Las Vegas to better ensure continuation of operations during a disaster • $950,000 authorized for Gateway phase II studio construction project • Architect retained for pickleball design near Event Center
