Rossmoor News, October 5, 2022

GRF AND MUTUAL NEWS

First Mutual approves plantings to complete turf-reduction projects

By Elizabeth CopleyFirst Mutual secretary

In print on page 18A

At its Sept. 23 meeting, the First Mutual board of directors approved $27,000 from reserves for five projects where grass is being replaced with drought-tolerant plants in areas where turf was removed this summer.

These areas are in Golden Rain entries 13 and 17 and Rockledge entries 5, 8 and 9. Also approved was $3,558 from operations to create a seating area at Rockledge Entry 8.

Turf-reduction projects followed by revegetation with drought-tolerant species during the rainy season will continue in other entries throughout the Mutual as a key water-conservation strategy.

Mutual Operations Department (MOD) Landscape Manager John Tawaststjerna reported that ongoing maintenance includes clearing of v-ditches and drainage systems in preparation for rain. He requested that residents contact the Work Order Desk if they see clogs in drains after rains.

The district landscape representatives have compiled a list of plant replacements for the upcoming rainy season based on members’ requests. The landscape committee is still looking for volunteers to fill positions of chair and vice-chair as well as District 5. Interested members should contact their district board member (listed with contact information on the Rossmoor website). A chair and vice chair can reside in any district.

MOD Building Maintenance Manager Dave Peakes reported on progress of the electrical range/subpanel inspections program; carpentry/paint rehabilitation; PG&E; and restoration of 2925 Golden Rain. Eleven electric panels have been replaced and nine more are waiting for permits before the work can begin.

Peakes estimated that an additional $500 will be needed per subpanel to repair drywall when subpanels are moved from inside to outside a closet within manor interiors. Peakes observed that replacing “like for like” subpanels may not provide sufficient capacity if the board decides on a longterm strategy to replace aged HVAC systems with heat pumps or other sustainable electric-based technology. The board requested that he prepare a request for proposal to present at a future board meeting.

Carpenters are currently working on 2200 and 2424 Pine Knoll Drive. Painting is underway at 2301 and soon 2224 of Pine Knoll Drive. A contract has been executed to install roof trusses at 2925 Golden Rain. The contractor will require use of the guest spaces in Entry 21/22 for its staging area during construction this fall. Once completed, the interiors will be finished.

Peakes reported that PG&E subcontractor VPI, since completing the drilling and boring, has left temporary patches on the asphalt and concrete and left damaged landscape. No one returned as expected to repair. When Peakes contacted PG&E, he was advised that due to funding, all the 56C projects will be on hold until January.

Under unfinished business, the board unanimously approved distribution of the informational sheet to remind survivors, upon the death of a member, of the requirements in Article 6.2.8 of First Mutual bylaws. Member Records will provide to survivor(s) when a death is reported to Member Records. The information sheet also will be included in New Member documentation The Director Tabulation Meeting for the Districts 1 and 5 election is scheduled for Thursday, Oct. 6, at 10 a.m. The link: https://v.ringcentral.com/ join/049217810 Meeting ID: 049217810 The annual meeting is scheduled for Tuesday, Oct. 11, at 10 a.m., on Zoom. At this meeting, the budget and estimated coupon for 2023 will be presented by MOD.

First Mutual members may comment and ask questions. Directors will vote on the proposed 2023 budget at the Friday, Oct. 28, board meeting. The next board meeting is Friday, Oct. 14, at 10 a.m. on Zoom.