Issue

Page 4A

Page 4A

Rossmoor News, Wednesday, June 29, 2022, page 4A

Stories on this page, to read as text

The page as printed

4A Rossmoor News • June 29, 2022

printed paper right now.

Peterson’s detailed report is now expected to be made on June 30 to the full GRF Board. The PowerPoint of that can be seen by going to https://tinyurl.com/27uvb65b

Facilities Master

Plan forwarded The Planning Committee voted unanimously on June 23 to recommend the GRF Board approve a Facilities Master Plan pinpointing the top planned capital projects in Rossmoor over the next decade.

GRF has been working for the past year with Berkeley firm ELS Architecture and Urban Design to develop a Facilities Master Plan for largescale projects to be built over the next 10 years, based on the money available to pay for them. A major part of that process was reaching out to Rossmoor residents to hear their priorities for major community projects. That outreach has included focus groups, a community survey and several presentations to the GRF Board and its committees.

The highest priority “near term” project identified is replacing the outmoded, cramped, physically deterio-

GRF NEWS

PLANNING: Project focuses on Tice Creek Drive

Continued from page 3A

Assembling Furniture Grab Bar Installation

Painting Plumbing

Electrical

Carpentry Dry Rot Repairs Appliance Installation Kitchen Remodels Bathroom Remodels

There is no job that is too small, or too large.

Need help with your “honey do” list? If so, give us a call! At Shanahan Services we believe that contractors should be your friend. We have been providing professional, high quality service in the Walnut Creek area for almost 20 years.

$25OFF

www.shanahanservices.com

925.722.5222

Your First Service Call

(1 Coupon Per Household. Expires 06.30.22)

License #822991 • Bonded & Insured General Contractor, Licensed Electrician

HANDYMAN SERVICES

Did you say “BOGO”?!

www.valleyaudiology.com

1872 Tice Valley Blvd. Walnut Creek, CA 94595 Valley

AUDIOLOGY

Hear life with our highly personalized care.

IT’S OUR JUNE BOGO EVENT!

Buy one pack of hearing aid batteries and get

your second pack FREE!

Call (925) 270-4552 now for the best time to drop by!

rating MOD office complex. Projected cost: $18,868,547.

The total cost for all selected projects, for all time frames, is just over $56 million. Those categorized as “immediate need” projects, for undertaking within the next two years, are pickleball courts, $1.2 million; phase two of the studio renovations, $950,000; ongoing study of a potential water reclamation project, $232,000; Dollar exterior accessibility improvements, $173,250; access control systems for various indoor spaces within Rossmoor, $145,000; and bocce court resurfacing, $55,000. That’s a total of $2,755,250. (The bocce court resurfacing is already complete.)

Projects in the “pipeline” category, which are now in process, include Gateway building replacement, $11,946,155; Dollar Clubhouse seismic work, elevator and various finishes, $8,059,711; Hillside Pool Building renovations, $774,033; and Rossmoor Parkway median conversion work to add parking, $385,000. Total: $21,164,899.

Two projects identified as “maintenance” are emergency access road studies of three possible locations, $605,000, and drought management proj-

ects, $550,000.

To see the full Facilities Master Plan report the Planning Committee received, go to https://tinyurl.com/25ez65sb

Safety project recommended The Planning Committee voted unanimously to recommend to the GRF Board approval of the Tice Creek Pedestrian Safety Project, following a spate of vehicle-vs.-pedestrian accidents along that roadway in 2022, including a fatality in April.

Public Safety Manager Tom Cashion told the Planning Committee the project is envisioned to include installation of six permanent radar speed reading devices, and 18 high-visibility crosswalk signs with arrows at nine crosswalks; painting “shark teeth” markers in front of each crosswalk; converting the crosswalks on Tice Creek at Singingwood Court and Canyonwood Court to high-visibility ladder crosswalks; evaluating the red curbs at all crosswalks to make sure sight distance is appropriate; and installing new stop signs and road markings on Tice Creek at Ptarmigan Drive. The projected cost for all this, plus a 10% contingency, is about $93,000.

GRF Board Agenda

Following are the agenda items for the GRF regular meeting on Thursday, June 30 at 9 a.m. in Peacock Hall and on Zoom. The complete agenda package is available on Simbli website at simbli.eboardsolutions.com/ca/goldenrain or follow the link, which can be found in Quickl Links, on the homepage of the Rossmoor website at www.rossmoor.com

1. Approve the MOD refund to be distributed to the managed Mutuals on a per-unit basis.

2. Approve budget calendar for 2022-2023. 3. Adopt 2023 Operations Budget Principles. 4. Consider a distribution to the Mutuals from the 2021 operating surplus, an expenditure for wildfire mitigation of $150,000, an expenditure for an internal audit of $110,000, an expenditure of $140,000 for consultant for new property management/accounting system, and that the remainder allocated to reserves pending future decisions, as recommended by the Finance Committee. Deferred May 26, 2022.

5. Update on the final Facilities Master Plan, as recommended by the Planning Committee. First Reading.

6. Consider authorizing agreement with Jett Landscape for completion of design and construction documents for the pickleball complex, as recommended by the Planning Committee.

7. Consider a recommendation from the Policy Committee to rename Berm Park and solicit ideas from the community.

8. Consider revisions to Procedure 103.0, Elections, to make permanent the temporary allowance of election nominating petitions to be circulated in the RM News and allow electronic submission of nominations, as recommended by the Policy Committee. First Reading.

9. Consider new Rule R118.0, Smoking Restrictions on Golden Rain Foundation Property, as recommended by the Policy Committee. First Reading.

10. Consider new Civility Task Force Charter. 11. Consider new Rule R117.0, Cooking and General Open Flame Restrictions on GRF Property During “Red Flag Warning” Periods, as recommended by the Policy Committee. Deferred May 26, 2022.

12. Presentation from Newfront Retirement Services on the recent change to the investment strategy of the Pension Plan.

13. Consider Securitas contract renewal. 14. Consider approving, as recommended by the President, resident member committee appointments, and a Board committee member replacement, effective July 1, 2022.

15. Consider Planning Committee’s recommendation to approve up to $200,000 for a design and noise study of a possible pickleball facility near the Event Center.

16. Consider approving $92,879 for Tice Creek Speed Safety Project.

17. Consider options for newspaper delivery due to continued staffing shortage.

YIELD TO PEDESTRIANS: All vehicles must yield to pedestrians attempting to use crosswalks in Rossmoor. Pretending to not

see pedestrians is no excuse for breaking the law and endangering the safety of fellow residents and visitors.