Issue

Page 11A

Page 11A

Rossmoor News, Wednesday, January 5, 2022, page 11A

Stories on this page, to read as text

The page as printed

Rossmoor News • January 5, 2022 11A

WALNUT CREEK HEARING AID CENTER

Between Rossmoor Safeway & Chase Bank www.WCHAC.com 925-933-3314

Why Hearing Engineering? Hearing impairment is complex, and gets more complex as we age. Hearing Engineering is a challenging method, using sound-engineering instrumentation, to care for and optimize the hearing abilities of each, very unique, individual over the years. The methods and instrumentation were patented by Dr. Gil Magilen, PhD (Biophysics, UC Berkeley) and prior UCSF Medical Center Neuroscientist. Debra Zupo, his daughter, has been using Dr. Gil’s Hearing Engineering with him for the past 14 years.

Debra and Dr. Gil hold Hearing Aid Dispenser license No.’s HA7652 and HA1444 respectively.

Skilled & Compassionate

TM

More than just a

hearing aid

It’s a revolution in sound, style, streaming and charging-on-the-go

Technology & Services at Five Pricing Levels NEW Portable Charger

Thinking of REMODELING and feeling overwhelmed?

Want to SAVE money and time?

303-475-2825 Wayne@TheMiddleman1.com www.TheMiddleman1.com

WAYNE LEISER

(Your neighbor)

The Middleman

CALL WAYNE!! He knows the best contractors at the lowest prices.

Wayne will help you tackle your toughest project,

he has a great eye for design and detail!

Call for a FREE consultation!

Check out my website to learn more

Nominated by “SCORE” for Outstanding Woman-Owned Small Business

925-330-1988 hello@carefreemoves.net

www.carefreemoves.net

Cynthia Nolan

owner Pack • Unpack • Organize

Serving Rossmoor Residents

for 20 Years All Women Company

Free Consultation

The Rossmoor News will have early deadlines for the Jan. 19 paper because of the Martin Luther King holiday.

All columns are due by Monday, Jan. 10, by noon; club trip, religion and movie articles by Tuesday, Jan. 11 at noon; all other club and organization articles by Wednesday, Jan. 12; and all ads, obituaries and letters to the editor by Wednesday, Jan. 12 at 3 p.m.

No deadline extensions are available due to the holiday.

Articles, columns and club trip listings should be emailed to news@rossmoor.com. Classified ads should be emailed to newsdesk@rossmoor.com.

MLK holiday means early deadlines

A conceptual drawing looks at how a combined community center and pool complex might be configured at Heather Farm Park.

Walnut Creek Council selects site for new combined community and aquatics center

By Ann Peterson Managing editor

A combined community center and aquatics facility will have a new home at Heather Farm Park – and it won’t require closing the current pools during two years of construction.

The Walnut Creek City Council unanimously selected the current community center site as the best of three options during its meeting Dec. 21. The council members agreed with staff and the Planning Commission that closing the community center was better than leaving Walnut Creek without city and county swim meets for two years, especially after all the disruptions brought about during the pandemic.

“This would be impacting the same generations that have been so impacted by COVID,” Councilmember Cindy Darling said. “And I don’t want to take anything else away from them at this point.”

The community center location was viewed most favorably because of its flexible use of land, central park location, continued rental potential next to the pond, key pedestrian access, and minimal impact on recreation activities during construction. As staff noted, the classes and offices at the community center are easier to temporarily relocate than the two pools at Clarke Memorial Swim Center.

The site, however, will require excavation for the pools and installation of some utilities.

“There is no perfect site,” Councilmember Loella Haskew acknowledged.

The third option on the table – located in the middle of the park – would have left both the community and aquatics centers open during con-

struction, but it had the least amount of support from staff, the Planning Commission and the council. In addition to impeding pedestrian pathways, it would have had the greatest impact on the picnic area and parking.

Councilmember Kevin Wilk also likes the opportunities presented for the soonto-be vacated swim complex.

“That actually would be a perfect area potentially to have bocce.”

While the council selected the site, the actual combined facility is just conceptual: a 25,000-square-foot single-story facility with either a 25-meter or 50-meter lap pool and additional recreation pool. Staff will develop two design options for review.

The next step also involves working with the Walnut Creek Aquatic Association to help raise funds for the new swim center. Funding options for the entire project have not yet been determined.

This first phase of the “Your Parks, Your Future” project could cost upwards of $25.17 million for the community center and, depending on the size of the pools, between $16.6 million and $26.42 million for the swim center.

Photos on this page

  • Site options map of Heather Farm Park showing numbered park features and the community center site, with a conceptual layout for a new pool area. Caption: A conceptual drawing looks at how a combined community center and pool complex might be configured at Heather Farm Park.