Mutual News
Third Mutual gets solar update, adopts architectural standards
By John SwearingenThird Mutual secretary
In print on page 5A
The Third Mutual Board of Directors held a regular meeting Nov. 8.
During Members Forum, a resident spoke concerning bulletin board use to announce meetings. Also, anyone who would like to receive an email or mailing announcing the meetings can contact Lucy Limon at llimon@rossmoor.com There was no treasurer’s report because financials were not received in time. The Mutual Operations Department has hired new personnel in accounting to help catch up and be on time with reports.
The following committee reports were delivered:
Governing Documents Policy 16.2.6 (payment method for general funds) was adjusted so that there will be no unallocated funds. The motion passed unanimously.
On solar panels, the owner pays upfront costs if installed individually.
Emergency Preparedness
The joint meeting with Rossmoor/PG&E was attended by over 100 people. It will be placed online so that everyone can access the information.
Solar Committee Nan Warren presented that real-time quotes for solar panels should be done in the next month. The Public Utilities Commission is delaying until January the changes in reimbursement.
Old Business The solar feasibility study for the entire Third Mutual was deemed not feasible. Third Mutual has an $8,000 bill to pay for the study. This works out to approximately $6.50 per unit.
Architectural Standards Policy: Remove photos of front doors and screens from policy. Standards were sent to residents for review and had two comments on hardwood flooring. No industry standard for hardwood flooring meets carpet noise levels.
A motion to adopt the new architectural standards passed unanimously. Directors will have flexibility to approve doors in their projects.
Project 53 disengagement update: It will be presented to the board within the next few months.
Project 23: Current CC&Rs are not the same as the rest of Third Mutual, and there are some areas that are not in compliance with state law. Some Realtors are having concerns about showing units in Project 23 due to this situation. A letter was sent to all residents in Project 23 concerning this situation and suggested a revote on CC&Rs or disengagement.
Some responses have come back, and one resident said they did not want to do either one. The board will discuss its options going forward in the executive board meeting.
New Business Landscape renewal has come up with Terra Landscaping. The contract will be discussed in the executive board meeting. An extensive and comprehensive landscape policy has been given to the board.
The next monthly board meeting will be on December 13, 2021. Special Board Meeting In a special board meeting held Nov. 15, a motion was made to expunge the meeting of June 2, 2021, because of inadequate meeting notification. It was seconded and passed 8-0. A motion was made to approve the feasibility study. It was seconded and passed 8-0.