Pickleball Courts, Dollar and Facilities Master Plan
The GRF Board of Directors and CEO answer some of the most frequently asked questions from residents.
In print on page 19A
Q:
Can the existing pickleball courts at Creekside be modified using modular or factory-built structures and mount them on adjustable piers so we can leave most of the existing concrete courts in place and avoid the cost of soil stabilization?
A:
This is an interesting idea, although an elevated platform could amplify the sound even more. We’ll look into it further.
– Paul Moderacki, District A
Q:
As a frequent lawn bowler, I’m opposed to taking away a lawn bowling green at Hillside for pickleball. Why is the lawn bowling green being considered?
A:
Various locations for pickleball have been explored, each with its advantages and disadvantages. No decision has been made on pickleball at Hillside. The Planning Committee wants to evaluate the site and compare it to other locations in Rossmoor before making a recommendation to the GRF Board of Directors.
Residents are welcome to attend the next Planning Committee meeting on Nov. 15 at 10:30 a.m. to hear the discussion and can participate during the Resident Forum, if they wish. (Zoom link: https://tinyurl.com/wnpmtxke)
– CEO Tim O’Keefe
Q:
Residents were under the impression (from Jeff Matheson’s proposal of November 2020) that he was proposing Buckeye for pickleball courts or Creekside, never Dollar. Suddenly, Matheson came in with ELS’ completely formed plan to build on Dollar. Why was Dollar considered a preferred site? Why weren’t other companies vetted for the proposed feasibility study?
A:
I was not responsible for selecting Dollar Park as a site worth investigating, and it was never identified as the “preferred site.” As the site was being discussed at the Planning Committee level, I recommended to the committee, that before any decisions regarding Dollar Park were made, it would be good to further study the site so the committee and Board has more information to base their evaluation and comparison to other sites. Based on this recommendation and the fact that ELS is already completing the Facilities Master Plan, which includes potential improvements to Dollar Park, I sought a proposal for the firm to complete a feasibility study. The GRF Board approved the funding and the study.
– Jeff Matheson, Director of Resident Services Editor’s note: At an Oct. 14 meeting, the Planning Committee unanimously agreed to remove Dollar Park from consideration for pickleball courts based on the residents’ input and the feasibility study findings. For more about the pickleball project, see the article on page 1A
Q:
Why are the ELS project proposals not posted to the website so residents know what are being planned?
A:
There are no “projects by ELS.” ELS is only under contract for the Facilities Master Plan and the feasibility study for Dollar Park. Just because ELS is completing the Facilities Master Plan does not mean they will be selected to complete any project once the Board decides to proceed with a specific improvement.
If the GRF Board decides at some point to proceed with a major renovation of Dollar Clubhouse or an accessibility project involving an elevator to the second floor, or renovation of the back patio, then a process would be undertaken, based on the scope of the project. It may include development of a request for proposals for design firms. A possible requirement may include experience or qualifications of working on historical buildings.
– Jeff Matheson, Director of Resident Services Editor’s note: The most recent update on the Facilities Master Plan to the Planning Committee can be seen online here: https://tinyurl.com/55v9n4jp. The GRF Board will hear an update on the Facilities Master Plan at a meeting on Tuesday, Nov. 9 at 9 a.m. (Zoom link: https://tinyurl.com/2nc87n6d)