Rossmoor News, August 18, 2021

Planning Committee reviews wish list Facilities masterplan offers sweeping ideas

By Cathy TallynStaff writer

In print on pages 1A and 18A

A thought bubble graphic of the most frequently used survey words, such as Parking, Food, Bus and Walking, on an orange background.
The thought bubble represents the words most frequently used on a survey about the long-range facilities plan in Rossmoor.

Rossmoor’s 9,500-plus residents were asked to dream big – and they did.

Their wish list was discussed at the GRF Planning Committee last Thursday and includes some components that could bring some major changes to the look and feel of Rossmoor.

The committee of four GRF directors makes recommendations to the full nine-member Board. It’s the committee’s job to sift through the ideas, determine what’s feasible and when projects should be undertaken.

There’s no cost estimate just yet or details about where the money will come from for the potential projects, but it’s sure to take decades for all these dreams to come true.

The ELS consultant team is at work on a Rossmoor Facilities Masterplan and has identified projects as immediate needs; near term (two to six years) and long term (seven to 10 years and beyond). Major changes would come to just about every area of Rossmoor, including the addition of pickleball courts and an amphitheater at Dollar; renovation of Dollar Clubhouse; a children’s playground at Hillside; replacing some buildings with larger ones at Gateway and Hillside; and a nearly complete re-do at Mutual Operations (MOD).

Committee member Paul Moderacki was concerned with the small number of residents (1,314) who responded to the written and online surveys.

Consultants said there was clearly some lobbying by residents with certain interests, such as for a RV dump station.

Moderacki also wanted changes at MOD to be more of a priority.

He questioned putting pickleball courts at the Dollar picnic area. He wanted to know if there had been any thought that GRF buy the nearby former Rite Aid building and use it for pickleball.

CEO Tim O’Keefe said Rossmoor talked to the property owner last year about selling, but it was for lease and not for purchase.

Kathleen Stumpfel was worried about the playground. “I can’t even imagine the safety issues.” She also said putting in an entry monument wasn’t high on her priority list and should perhaps be eliminated.

“Dollar needs to be pretty high on the list,” member Ted Bentley said. “It gets so much use.”

Consultants broke down suggestions by location.

Architectural renderings and floor plans of the Dollar Clubhouse in Rossmoor, with a bulleted list of planned upgrades.
Consultants showed the Planning Committee some ideas for improvements at the Dollar Clubhouse, part of an extensive long-range facilities plan study in Rossmoor.

Gateway complex Plans now call for a Gateway Town Square with a shade screen over Peacock patio, demolition of the billiards and multipurpose rooms to make way for a two-story building with a smaller area for billiards, a café with patio seating and various-size meeting rooms. The rest would remain basically the same.

Dollar Clubhouse The former two-story Stanley Dollar mansion changes would include a general electrical upgrade, the addition of an elevator, kitchen renovation, better accessibility, improved restrooms and a new paint job and carpet.

Dollar picnic, pool areas

Plans for the Dollar picnic and pool areas include pickleball courts, an outdoor amphitheater with stage, repaving of the terrace and better lighting.

Hillside Clubhouse At Hillside, the building that houses the Diablo Room and restrooms would be left alone. But there would be some expansion with some major changes.

These include replacing the Las Trampas and Vista rooms as well as the lawn bowling mat house with one taller building that has a larger theater and meeting room as well as a café and new mat house. There would also be improvements to accessibility.

Hillside pool, Sportsmen’s Park There would be changes at the pool and adjacent Sportsmen’s Park. The picnic area would be reconfigured, a shade structure added, a children’s playground put next to the pool, improved access and the possibility of food trucks parking in the area.

MOD Changes to Mutual Operations at the top of Rockview Drive would include replacement of the office building with two separate facilities, relocation of the warehouse and vehicle maintenance to the upper RV parking lot, addition of a RV dump station and upgrades to the electrical system at the corporation yard.

ELS said it plans to have financial studies to the committee by Sept. 30.

Others Suggested for immediate need also included Gateway studio renovations and walking paths. Near term included a water reclamation site, Fireside Room kitchen renovation, golf course crossing replacements, bike paths and repair station and lawn bowling shade structure.

In other business, Resident Services Director Jeff Matheson told the committee that an overall study for pickleball courts, an outdoor amphitheater and other projects at Dollar picnic and pool areas is underway and could take two months.

Committee members spent considerable time talking about the need to revise Rossmoor’s general plan. They decided an update wasn’t a high priority and individual committee members could review the very long document and give their input.