TOO MANY APPROVALS NEEDED

Diane ArndtPtarmigan Drive

In print on page 8B

I am troubled by the reply given in an editor’s note, which outlines steps to rebuild a residence. I realize there are many different models of condos and co-ops but certainly there must be similarities that don’t require a new architect. Sounds like recreation of the wheel is taking place. At least four steps regarding bids seem redundant: 1) approve bids packages; 2) review bids – award contracts; 3) after city approval, contracts go out to bid and 4) after contract awarded, construction begins.

Why do bids need to be approved multiple times? Why can’t Rossmoor work with an architect used previously to speed up the process? In my mind, the number of approvals is outrageous, especially when a person or family has to put their life on hold. I feel confident that there is someone out there who can streamline this process. Imagine if a fire did occur here and multiple residents were displaced. Implementing the current rebuilding process would be a nightmare.