CLEARING UP MISCONCEPTIONS
Rossmoor Solar Initiative:Barry Brian, Terra Granada DriveAdrian Byram, Terra Granada DriveDick Locke, Rockledge LaneJohn Moe, Golden Rain RoadArt Salzfass, Terra Granada DriveBrad Waite, Ptarmigan Drive
In print on page 1B
We appreciate Jack Appleman’s support of renewable power and regard for a deliberative approach, (“Restraint on solar project appreciated,” June 16, Rossmoor News). However, we’d like to correct several misconceptions and inject a dose of economic reality.
First Mutual is now over 55 years old and no plan yet exists to upgrade deteriorating infrastructure. The purely deliberative approach will take years and cost owners over $150,000 before any upgrade even starts. Meanwhile, our consultations with solar experts immediately revealed serious electrical safety issues; an electrical fire occurred just two weeks ago. Action is needed now.
The Rossmoor Solar Initiative is an industry-standard, collaborative, long-term design-build process structured to bring in millions of outside pension-fund dollars to perform necessary infrastructure upgrades at no cost to current owners in First Mutual and other Mutuals. Most of these upgrades will be paid for by the savings generated by installing solar power. However, a historic opportunity to maximize these savings will vanish in a few months as California changes its rules on solar subsidies.
So First Mutual faces a choice: act now, effect critical electrical upgrades within a year at no cost to current owners and initiate a long-term, fully-financed, competitively-bid collaborative approach to future upgrades paid for from solar power. Or wait, raise owners’ coupons next year to pay for all the deliberative consultants needed, cross fingers nothing terrible happens in the next year or two while deliberations ensue, and then assess how current owners will pay for the upgrades.