Rossmoor News, June 23, 2021

First Mutual Board gets rehab update

By Peggy KaiserFirst Mutual secretary

In print on page 13A

At the May 26 First Mutual Board meeting, Building Manager Doug Hughs reported that rehab on buildings was proceeding on schedule.

He noted that plumbing issues such as leaks in slabs are occurring with more frequency. It used to average one a year, and now it averages one a month. Rotting waste lines are also an issue in G-11 walls.

The treasurer reported that the 2020 audit has been completed and will soon be in the mail to members. The Mutual has started to call members who are in arrears to a hearing.

The board approved opening the accounts for the Liberty Mutual Program at City National that would include a sweep account. More details will be presented at June’s meeting by CFO Joel Lesser and/or Tess Haskett, assistant controller.

Building maintenance is over budget with carpentry, plumbing and gutters being the leaders. Other categories over budget, as of April financials, were custodial services, fire safety and professional services.

Budget and Finance Committee Chair Jean Autrey reported that the committee reviewed the April financials. Insurance and water, two budget breakers last year, are under budget so far.

Insurance will remain under budget for the year, but while water remains within budget now, that is likely to change soon. With the drought, residents are encouraged to conserve water and report any leaks within their manor, such as dripping faucet or toilet running between flushes. Residents are also encouraged to report any landscape sprinklers they observe broken or not operating properly.

The committee inquired about the outdoor electrical service panels that have been described as dangerous by some. Hughs reported that the Zinsco panels are original but have never been identified as dangerous or the cause of or near a fire in the valley.

He noted that about two-thirds of manors still have original interior service panels. Many of them are Zinsco and have not been identified as dangerous.

The committee also reviewed, with Hughs, the worksheets for the component analysis report. The worksheets are provided to The Helsing Group, which does the Reserve Fund Analysis.

The committee discussed the proposed solar initiative. Many concerns were raised, and the committee believed that more time is needed to fully understand and analyze all that it proposes.

The committee was also concerned that there was no bidding. The board was being encouraged to sign an engagement letter with the first interested party, Table Rock Infrastructure Partners, a private equity firm.

John Moe reported that, as usual, trash sorting is still not in compliance with the present rules. No one has been able to find a solution that works to educate everyone and with the end result that everyone is sorting trash correctly.

Post board meeting, the directors met in executive session on three individual member matters: One concerning unauthorized removal of common area landscape and planting new landscape; a member contesting that a water leak was caused by an alteration; and a member in arrears in the monthly assessment payments.

Announcements: The next Budget and Finance Committee meeting is Friday, June 18. The next board meeting is Friday, June 25. Times and Zoom login information can be found in the Mutual Meetings box of the Rossmoor News.