Rossmoor News, September 23, 2020

STUDIOS SHOULD COME BEFORE WALKWAYS

Jane BlanchardTerra Granada Drive

In print on page 5B

Regarding the GRF Planning Committee’s walkways idea in Sept. 16 Rossmoor News: There are plenty of sidewalks, driveways, and pathways running through Rossmoor now. I have discovered many interesting areas just by walking in and out of entryways.

The Gateway Studios renovation has been in the works for several years and should be completed before there is any talk of more places to pave over in Rossmoor. Incidentally, I am not a studio user, but it is only fair to those who do use the studios that the remodel of this area takes top priority.