Rossmoor News, September 16, 2020

Paving schedule announced for some Rossmoor entries

In print on page 4A

The first dates and locations have been announced for paving of entries in Rossmoor. Entries will be completely closed for vehicles between 7:30 a.m. and approximately 5:30 p.m. on paving days; only emergency vehicles will have access during those times.

The schedule is as follows, weather permitting: • Monday, Sept. 21 and Tuesday, Sept. 22: Ptarmigan Drive Entry 7 • Wednesday, Sept. 23 and Thursday, Sept. 24: Terra Granada Drive Entry 25 • Friday, Sept. 25: Ptarmigan Drive Entries 8 and 9 • Thursday, Oct. 1: Terra California Drive Entry 8 Dates and locations for paving in First and Second Mutuals will be announced later.