The deluge of PG&E ads warning us to prepare for extended power outages is a warning that PG&E really plans to do some.

In follow up to the holocaust started in Paradise by a high voltage transmission line last fall, PG&E is now authorized to preemptively shut down transmission lines anytime the wind is forecast to gust at 45-plus miles per hour. They will be demonized and punished if a Paradise situation happens again. They will not be held liable for any amount of damage to public civility and well-being that their outages create.

I think the GRF board and staff need to plan as soon as possible how best to deal with outages affecting Rossmoor. How many employees will be able to get to work here? How about housing and feeding ones that are here but can’t get home or are willing to stay and help?

How will residents be kept informed? Or dealing with sick, injured or dying residents when no police, fire or emergency services are available? What, if anything, should residents who have made survival preparations be expected to do for ones who haven’t? Maintaining law and order, and dealing with offenders? Etc.?

Our urban society can handle short-term large power outages and longer local ones, but not situations of size and duration PG&E proposes to create. And sadly, these extended and wide area outages will at most be making only a tiny contribution to wildfire prevention.