Waterford holds grand opening of solar array parking lot project
By Maureen O’RourkeManaging editor

After 4-1/2 months of construction and landscape work, the Waterford’s solar panels project is now complete. The Waterford board and staff held a grand opening and ribbon cutting of the project on July 9 in the parking lot under the solar array.
Also on hand were residents of the Waterford, GRF CEO Tim O’Keefe, members of Sustainable Rossmoor and representatives of the solar company that installed the panels, Solar Gain West.
“This is truly a first for Rossmoor,” said Mutual 58 President Mary Hurt at the ceremony.

The panels cover the employee parking lot on the corner of Golden Rain Road and Rossmoor Parkway and create squares of light on the parking lot when the sun shines through.
The solar array is expected to save the 300-unit congregate Mutual more than $6.5 million on its electric bills over a 30-year period. Approximately 80 percent of the Waterford’s energy demand is expected to be generated from the solar panels.
Solar Gain West designed the structure and ushered the project through the permitting process with the city of Walnut Creek. The solar array is designed in such a way to get as much optimized surface with 1026 modules combined to form one single array.

When the work was finished, all new landscaping was installed around the parking lot. Waterford and Securitas employees park in the lot.
In March 2017, the Waterford negotiated a power purchase agreement with Nobell Energy Solutions LLC and Solar Gain West to finance, design, construct and maintain the solar array at no cost to the Mutual.
The Waterford had been looking at going solar for at least seven years. Former Waterford President Annette Patch was given credit for spearheading the project.