OLD UNITS NEED TO BE REMODELED
Clif SchofieldRockledge Lane
In print on page 18A
I have read so many times of people complaining about the remodeling that occurs here in Rossmoor add nauseum!
We pay HOA fees here to keep up the building and landscaping, so why is that different than keeping up the interiors? Nothing lasts forever and that really holds true for Rossmoor. These units built in the 1960s are of some of the worst workmanship I have ever seen. As a resident, custom home builder and general contractor who has remodeled a number of units here, I don’t remember seeing worse workmanship of a planned development.
And that is not addressing the types of material used in constructing these units: cheap T-11-type siding that is old, deteriorating and a potential fire hazard; aluminum wiring used for main panel runs; circuits connected from master bedroom to bathroom on a 15-amp circuit (plug in a hair dyer and something in the master bedroom and see what happens).
We have a saying in the construction industry “They don’t build them like they used to, and it is a good thing that they don’t.”
As for the time frame that it should take to remodel a kitchen and bathroom completely– not more than 30 working days and half of those days you should not hear much noise. If it is taking longer or is that noisy, you picked the wrong contractor. And no, I will not bid your work. I have no desire to do any additional remodels in Rossmoor!