Rossmoor News, April 18, 2018

CC&Rs STILL HAVE PROBLEMS

Elvera BordessaStanley Dollar Drive

In print on page 17A

We’re not there yet on Third Mutual CC&Rs. There is another major problem beyond those identified in the April 4 Residents’ Forum. Here is the problem that has not been discussed.

The board does not seem to recognize it may have created a document that may fire up a future legal battle since the proposed CC&Rs create a conflict between the old and new verbiage. A big problem area is Articles 6 Maintenance, Repair and Replacement Responsibilities.

The differences regarding who will be responsible for ongoing costs for work that needs to be done on condos needing significant replacement, rehabilitation and repair, see sixth Revised CC&Rs version 6.2.7 Decks (a) (b) or Window Systems and Sliding Glass Doors 6.2.21 (a) (b). Major work on decks, balconies and walls took place on condos throughout Third Mutual 10 to 12 years ago as a result of water intrusion. Many of these same condos had to undergo work again in 2016, 2017 and 2018 for failing decks and balconies as a result of water intrusion.

Currently in the lineup is another group of condos requiring similar work for the same reasons. This is the problem. The next group of condos needing similar substantial replacement, rehabilitation/repair will not be grandfathered in, therefore owners may not benefit from the same costs covered that existed for the condos done in 2011, 2015, 2016, 2017 and the condos being worked right in 2018 still covered under the old CC&Rs.

The new language conflicts affecting the work being done now and going forward. It is not worth the price of sending out a document that remains problematic.