Dismantling the modulars
In print on page 7A

With all the equipment now moved out of the temporary fitness center in the modular buildings, the modulars in the parking lot are being dismantled, will soon be hauled away and the lot will be repaired. Depending on the weather, the lot is scheduled to be repaired on Jan. 17 and 18. The work may be able to be done without closing the parking lot or the pools.