GRF Board meeting
GRF Board approves 2018 machinery and equipment and capital budgets
By Maureen O’RourkeManaging editor
In print on page 17A

Paving throughout Rossmoor, Dollar Clubhouse accessibility improvements, golf course and lawn bowling green improvements, information technology additions and updates, Rossmoor website updates and improvements at clubhouses were among the items in the 2018 capital expenditure and machinery and equipment budgets approved by the GRF Board at its Dec. 7 meeting.
The capital project budget totals $855,000 and the machinery and equipment budget totals $905,950 for a grand total of $1,760,950, which is paid by the Trust Estate Fund and not the operating budget. These projects are not covered by the monthly coupon.
During the GRF Board meeting, Finance Committee Chairman David Smith said the funds are available for all the capital projects.
Each year, GRF staff prepares a capital expenditure list, which is first reviewed by the Finance Committee and then submitted to the GRF Board for final approval. In order for an item to be considered a capital expenditure, it must cost at least $5,000.
Here are the capital projects the Board approved:
1. Valley-wide paving for $460,000
2. Corporation yard fire and domestic water lines replacement for $120,000

3. Dollar Clubhouse accessibility improvements, which includes a ramp at the front entry, replacement of entry door to make it automatic and relocation of accessible parking spaces for $80,000
4. Storm water filtration system for $70,000. Director Bob Kelso asked for more details on this item. Director of Mutual Operations Paul Donner explained that the two sand filters near the vendor staging area were built in 2010. Installed to comply with storm water regulations, they serve to filter out contaminants in storm water runoff. The sand is saturated with contaminants and needs to be replaced.
5. Rossmoor Gardens and cactus garden perimeter fencing replacement at a cost of $65,000
6. Dollar Ranch Course ninth green reconstruction at a cost of $60,000
Here is the machinery and equipment budget:
Vehicles: pickup truck, utility vehicle for the golf course, a trailer and a vehicle diagnostic unit upgrade
Golf and lawn bowling: tractor mower, sprayer, tractor/loader, greens mower for lawn bowling and a sod cutter