DISASTER WAITING TO HAPPEN
Mariann CarlinPtarmigan Drive
In print on page 1B
I quote from a recent letter to the editor that was published on Oct. 16 in the San Francisco Chronicle titled “Prevent the Next Wildfire Catastrophe”:
“If it is determined that downed power lines were a cause of the tragic Wine Country fires, then the California Public Utility Commission needs to take immediate action. Northern California is becoming more drought prone, with higher temperatures, fiercer winds and more dying trees and vegetation. Though it might be expensive and cause inconvenience, power lines ought to be placed underground.”
This letter makes a lot of sense. It continually amazes me that PG&E recently was allowed to build that massive power line infrastructure on the top of Ptarmigan Drive, so close to dwellings and surrounded by dry hills. All this in the midst of a senior community, where in case of fire the only evacuation route for hundreds of people is one very long curving road. This installation could be the cause of a disaster waiting to happen.