Hillside kitchen improvements completed Energy upgrades offered
In print on page 4A

The Hillside kitchen is now up and running after a threeweek shutdown to add a grease interceptor and a floor drain. The work was required by the sanitary district and the city of Walnut Creek.
The photo to the right shows the kitchen torn apart and the photo below shows the kitchen all put back together. Once the work was completed, the kitchen was put back to the way it was before.

The only difference is the floor drain hidden underneath the counter top and a hatch for the grease interceptor is also underneath the countertop.