Rossmoor News, July 5, 2017

Road work causes delays, but it’s a smooth ride now

In print on page 2A

A red car drives down a newly paved road past fresh white arrows and lane markings painted on the asphalt.
News photos by Mike DiCarlo

Rossmoor residents are now driving on a new roadway outside the gate after the city of Walnut Creek patched it and finished it off with a cape seal on June 26. The city finished the painting of the lines, arrows and crosswalks (pictures show temporary lines), last Friday. Temporary traffic lane markers will be replaced this week. Traffic was tied up entering and leaving Rossmoor while the cleaning, repaving and sealing was being done. Residents complained that it took more than 20 minutes to get from the Rossmoor Parkway/ Golden Rain intersection on to Tice Valley Boulevard. Residents can find out about these kinds of traffic delays by signing up for the Rossmoor Nixle notification system. To date only 1,000 people have signed up and all of them received notices of the roadwork via text, phone and/or email.

A newly paved parking area with fresh white painted stall lines and a red curb along the edge.

News photos by Mike DiCarlo