Repaving outside gate on Rossmoor Parkway
In print on page 9A

O’Keefe, who had originally pursued a complete repaving of the road with the city, is satisfied with the compromise between a complete resurfacing and the cape seal alternative.
“It’s the best we can do and it’s a big improvement over what we have,” said O’Keefe, adding that it will “look like a new road” when it’s done and should hold up well to the 3.6 million vehicles that go through the Rossmoor gate every year.
The CEO says the rough, pot-holed lanes in and out of Rossmoor on Rossmoor Parkway have been “a constant source of irritation to residents” even before last winter’s rains chewed them up even more.
O’Keefe said he’s been going back and forth with the city for more than 1-1/2 years, trying to get the road fixed.
“At my first meeting with the mayor and city manager, I told them, ‘you need to do a better job of maintaining the road,” said O’Keefe, adding that he was basically told, “We will take care of it, don’t worry.”
After some back and forth with the city over several months, O’Keefe sent an email to Ballenger, explaining that Rossmoor residents pay taxes, but don’t feel they receive services proportionate to the rest of the community.
Additionally, Rossmoor takes care of its own internal roads and even maintains the landscaping along the stretch of Rossmoor Parkway to Tice Valley Boulevard.
“In March 2017, I received an email from Heather, telling me that they couldn’t repave the road,” said O’Keefe. “All they could do was put down slurry – a sheen of oil and heavy tar – to preserve the road and help prevent cracks, bumps and potholes.”
O’Keefe responded that the slurry was insufficient, and that the city had previously committed to a new road.
Then, a month ago, O’Keefe contacted Ballenger again, emphasizing that Rossmoor seniors deserve attention as an “important part of the fabric of the community; not only paying taxes, but voting, volunteering and helping out in civic ways.”
Finally, the city suggested doing the cape seal – not a complete resurfacing, but superior and longer lasting than just the slurry seal.
In a statement to residents, the city’s Public Works Project Manager Joe Sadri said:
“We realize what an inconvenience this surface treatment is to residents, but the alternative of doing nothing will result in accelerated pavement deterioration requiring very expensive pavement overlays and earlier reconstruction, which are not possible with the city’s limited budget. We appreciate your cooperation and patience ...”
For more information, visit www.walnut-creek.org/roadwork.