The modular units for the temporary Fitness Center have been installed in the Del Valle parking lot. There was a delay outside of our control in obtaining the city’s and fire marshal’s approval for the certificate of occupancy, which resulted in the modular units opening on April 19 instead of April 17.
The general contractor has installed a fence around the front of the Del Valle complex, removed the wall between the pool and fitness center and the locker rooms have been completely gutted. The renovation is officially under way!
As was reported last month, the pool will also be closed through June for the replacement of the pool plaster, installation of the ultra violet filtration system, and the replacement of the heater and pump. After consultation with the renovation contractor, it was agreed it would be less disruptive for residents to close the pool for three months in 2017, rather than intermittent closures with little or no notice throughout the spring and summer while the construction work was going on–and then close again next year for several weeks to re-plaster and replace the equipment.
So far, everything is on track. Stay tuned for more updates. Thanks to everyone for their patience. In a few months, we will have a beautiful facility for everyone to enjoy!
Fireside audio-visual upgrades
Over the last several months, there have been increasingly unreliable connections to the audio visual components in the Fireside Room and in other venues such as the Event Center. The issues in the Event Center have typically had to do with the Wi-Fi router being overloaded with up to 400 cell phones “pinging” the router every few seconds regardless of whether or not anyone is actually using their phone. This issue has caused disruptions to presenters who were relying on a Wi-Fi signal for their presentation. This particular issue has been solved with the installation of wired ports near the stage.
At Fireside, the issues are different. A recent full house was turned away for a “Hamilton” presentation due to a failure of the sound system. The original wiring and connection ports were installed more than 15 years ago and were used infrequently in the early years. Over the last several years, however, it has become more and more common for presentations at Fireside to include audio and/or video presentations, sometimes several in a day. Every time equipment is plugged in and then removed from the ports, stress is placed on the connection points that can bend, weaken or break those connectors and wires. In addition, some of the A/V equipment is simply too old.
At the April 27 GRF Board meeting, the directors will consider a budget for upgrades to the Fireside Room to improve the reliability of the A/V system.
Traffic and pedestrian safety study
Resident safety is concern number one for most in Rossmoor. In 2016, the Golden Rain Board authorized the retention of a traffic engineering consultant to study ways to make our roads safer for vehicles and pedestrians. The consultant has studied the traffic patterns on the main roads and intersections throughout Rossmoor. GRF expects to have their recommendations ready for review at the May 25 Board meeting.
Status of restroom repair
This winter’s record rains, while welcome relief from the drought, placed tremendous stress on some of Rossmoor’s trees. A massive oak toppled and crushed the restroom, a GRF maintenance vehicle and a storage between Dollar pool and the 17th green on Dollar Ranch Course earlier this year. Fortunately, no one was hurt. Since the restrooms were originally constructed, additional ADA requirements have been established and the repair will trigger upgrades to restroom accessibility. An architect has been retained to incorporate the accessibility upgrades into the design. The installation of temporary restrooms will begin shortly and should be completed soon. Completion of the renovated restrooms is expected by sometime this summer. The total renovation cost will likely not exceed the GRF insurance deductible so the Trust budget will cover the repair and upgrade.
Follow up
At last month’s GRF Board meeting, the Board authorized the installation of a bathroom at the Garden Club and the retention of an architect to design accessibility improvements to the front and rear of the Dollar Clubhouse. These are important first steps to improving both amenities. Actual construction will not occur for several months as the designs are completed, permits are acquired and the projects put out to bid.
Employee transition
Two employees commenced employment with the Golden Rain Foundation in March: Amanda Davis, senior accountant, Accounting; and Kimberly Loller, bus driver, Transportation.
Three employees left employment with GRF in March: James Duffley, fleet manager, Transportation; Carlos Jimenez, landscape technician, Landscape; and Deborah Laughlin, front desk attendant, Fitness.
(The monthly Membership Transfer Fee information has been transferred to the Treasurer’s Report, which will be in the News next week.)