Rossmoor News, March 15, 2017

Project 39 residents hold special meeting on budget, landscaping, solar

In print on page 6A

Project 39 residents will have an important meeting on Friday, March 24, at 3 p.m. in the Donner Room at the Event Center.

Jean Faszholz, director of Project 39 in the Third Mutual, announces that members of Mutual Operations staff will report on the 2017 budget, landscaping, building rehabs and roof repairs.

Project 39 consists of Saklan Indian Entries 1,3,4,5,9,11,12 and 13 and Terra California Drive Entries 7A and 8.

Since 2006, it is required by law that each manor requesting a permit to install solar panels, in addition to other alteration requirements, must be responsible for the expense of sending out a ballot to every member in their project, and 67 percent must vote to allow this one manor to install solar in order for them to proceed with the installation. Each one who wants solar must follow this procedure.

Project 39 members will receive their sealed ballot in the mail and be able to vote at the meeting. Members not attending will also be able to vote, of course.

If 67 percent of the 130 manor owners of Project 39 vote in the affirmative, those who want solar will still have to satisfy all the requirements in the permit process except conducting the costly project-wide election.

This vote will not require anyone to install solar. It will only allow Project 39 neighbors who want solar to be able to have it.

Wine, cheese and other refreshments will be served.

For information, contact Faszholz at texasjeanfasz@gmail.com.