Rossmoor News, Wednesday, January 11, 2017, page 1A
Stories on this page, to read as text
- Solar panels could be installed at MOD as early as the summer
- GRF staff lists 2016 accomplished goals
- There’s still time to sign up for Comcast Internet, HD
- Residents asked to give feedback on traffic study
The page as printed
ROSSMOOR NEWS
Solar panels could be installed at MOD as early as the summer
Wednesday, January 11, 2017 Walnut Creek, California Volume 50, No. 44 • 50 cents
Section A Arts and Leisure.......... 17-24A Classified...................... 32-43A Clubs............................. 27-29A Health........................... 30-31A Main News...................... 1-13A Movies........................... 26-27A Op/Ed Columns........... 14-16A Residents Forum................14A
Section B Arts and Leisure listings...10B Bridge............................... 2-3B Calendar........................... 6-7B Channel 28 TV Guide........12B Clubs......................3B and 11B Excursions........................ 7-8B Obituaries.............................5B Religion............................. 4-5B Sports................................ 1-2B
INSIDE THE NEWS
She makes Bloomin’ Plates
See page 3A.
www.rossmoornews.com
GRF staff lists 2016 accomplished goals Goals range from computer storage, turf reduction on the golf course, to pickleball courts
Residents asked to give feedback on traffic study
There’s still time to sign up for Comcast Internet, HD
Continued on page 12A
Continued on page 7A
News photo by Mike DiCarlo Pickleball courts replaced the tennis courts on Rossmoor Parkway at the end of 2016.
By Cathy Tallyn Staff writer R
ossmoor’s two solar farms are a step closer to reality. The solar arrays will be located off Rockview Drive, near Mutual Operations (MOD).
GRF signed an agreement with NextEra Energy and Solar Technologies a week-anda-half ago. The company will now apply for permits from the city of Walnut Creek. It should take four to six months for the environmental assessment.
“We’re likely looking at construction this summer,” said Jeff Matheson, Rossmoor’s director of Resident Services.
Energy from the 1 megawatt system should provide 55 to 60 percent of the energy needed to power Rossmoor’s common areas, such as the clubhouses and staff offices, Matheson said.
The savings is estimated at $250,000 a year – or about $6 million over the 25-year life span of the agreement. The rest of the power needed will come from MCE (Marin Clean Energy) and PG&E.
One solar farm will be built on the hillside below the MOD complex. The solar panels will be positioned in such a way as to minimize the visual impact.
“They shouldn’t be detected by any resident in the valley,” Matheson said.
A second solar farm will be built on 14-feet high canopies that will be added to the lower RV lot, which wraps around three sides of the MOD build-
All Comcast Internet and high definition TV installations in Rossmoor manors are either complete or scheduled to be completed.
Those who have previously declined Internet and HD services and have changed their mind may stop by the Fireside lobby to schedule an installation and enjoy the benefits of the Internet and a high definition TV signal. (See the schedule for Comcast representatives on page 5A.) There is no charge for the installation or the equipment.
The Golden Rain Foundation has retained TJKM to study the roadway conditions and driver behavior in Rossmoor to identify problems and provide solutions to improve traffic and pedestrian safety and circulation.
The primary goal of the project is to make Rossmoor streets safer for pedestrians, bicyclists, golf cart and automobile drivers, and improve quality of life for residents, by making Rossmoor more appealing to walking, living and leisure
The study area is primarily focused on Rossmoor Parkway, Tice Creek Drive, Golden Rain Road and Stanley Dollar Drive. In addition to the four major arterials, all side streets in Rossmoor will also be evaluated for safety improvements.
Golden Rain Foundation and TJKM held a community event on Dec. 5 to gain input from the community members.
Residents can check out the presentation and the materials from the outreach meeting at the website: www.tjkm.com/projects/rossmoor. In addition, residents can give feedback in the comment box on the same site.
At the beginning of each year, the GRF senior staff establishes additional goals, on top of their routine/daily duties running their departments. These goals are discussed with the CEO and worked on throughout the year. The following are the additional goals that senior staff achieved for the community in 2016:
Accounting and Information Technology/
CFO Rick Chakoff • Prepared a long-range capital and facilities maintenance plan.
• Provided online paycheck access to employees.
• Acquired and implemented a computer storage system providing efficient data back-up and recovery.
• Provided remote computer access to employees.
• Acquired a new phone system that is in the process of being implemented.
Communications/ Director
Maureen O’Rourke The Rossmoor News,
Channel 28 and Rossmoor websites • The News did a series of articles on the Del Valle Fitness Center upgrade throughout the year.
• The News did a series of articles on the new Comcast agreement.
• The News did a series of articles on the drought and how the Mutuals and GRF changed their landscaping and water use for water conservation. Articles also extended to the promotion of Rossmoor’s first Earth Day and solar power.
• The News did a series of articles on the Rossmoor performing arts groups and how they contribute to Rossmoor.
• The News did minor redesign of the paper to make it easier to find GRF meetings and other important articles.
• Channel 28 started an interview show with CEO Tim O’Keefe. Two shows ran in 2016. • The Communications Department director spoke to several clubs and gave demonstrations on how the Rossmoor websites work.
Executive Services/Senior
Manager Paulette Jones • Hired and fully trained department part-time receptionist for reception desk and mail clerk duties.
• Implemented online/ electronic distribution of GRF Board and committee agenda packages.
• Became proficient in Doodle scheduling application.
• Became proficient in Outlook calendar.
• Made arrangements for two GRF Board retreats.
• Made arrangements for the employees’ annual pancake breakfast and holiday luncheon, including soliciting raffle prizes from vendors.
Golf Course/Director
of Golf Mark Heptig • Completed rebuild of three golf hole bunker complexes.
• Completed phase 2 of the Turf Reduction and Irrigation Modification Project with several changes due to resident input.
• Completed phase 1 of the Cart Path Repair Project.
• Continued the geese reduction project by adding permanent fence around lake and purchasing a drone.
• Completed a mid-season customer survey that resulted in high marks for the golf courses, staff and golf shop.
• Relocated the turf nursery
and added several decomposed granite service paths. Also planted 35 trees and relocated another 12.
• Overcame the drought to have a golf course in excellent condition.
Human Resources/Senior
Manager Judith Perkins
• Completed the semi-final draft of the employee handbook rewrite.
• Completed the benefit brokerage request for quote.
• Completed the 2016 compensation study.
• Completed OSHA updates.
• Worked on blood borne pathogens, hearing loss prevention, airborne protection.
• Completed the Human Resources job description rewrite.
• Developed and delivered required staff training.
• Reviewed and updated human resources practices
Photos on this page
- Newly finished blue pickleball courts with white lines and nets sit on green surfacing, with bare trees and benches behind a dark fence. Caption: Pickleball courts replaced the tennis courts on Rossmoor Parkway at the end of 2016.

