A look at preliminary budget
In print on page 15A

property), Smith asked: “What is the primary obligation of the GRF Board?”
Grafals said the primary obligation is to safeguard the assets of the Trust, which includes the buildings.
“It seems clear to me that the Board has to buy earthquake insurance to safeguard the assets,” Smith said.
O’Keefe explained that GRF would have to assess as much as $3,200 to all residents if the common properties were damaged in an earthquake. “Less than $29 per year per manor to insure against an earthquake is a bargain,” he said.
Trust facility/property
maintenance projects

The list of proposed 2017 trust facility and property maintenance projects totaled $873,700 and included the following:
• Paving and street maintenance, which was the highest cost item on the list at $540,000
• Sidewalk maintenance and installation
• Water/sewer drainage repair • Open space maintenance • Equipment maintenance • Golf course storm drain repair • Dollar trellises • Facilities window replacements • Event Center trellis repair • Dollar Clubhouse interior paint and wall coverings • Trails maintenance • Defensible space fire abatement
• Golf course cart path repair program
Regarding the street maintenance costs, Kelso questioned whether all or part of the costs should be capitalized. There will be further discussion on this.