RAISED ROOF IS KEY TO RENOVATION
Claudia TierneyChairwomanFitness Center Advisory CommitteeTerra Granada Drive
In print on page 14A
The GRF Board meeting on Thursday, June 30, (tomorrow) may well be a critical turning point as agenda item 2 is to “Consider approving the completed design development phase of the Del Valle complex renovation project and authorize the design team to proceed with the completion of the construction documents.”
Tomorrow’s meeting is sure to have optional items on the line such as raising the roof and adding windows. There will be a special presentation by architect David Petta showing the center with and without the raised roof. Residents find it challenging to imagine the difference (between raising and not raising the roof), so seeing these renderings will be critical to supporting this item.
Thinking of this issue from another point, imagine the Event Center, Creekside and even Gateway with lowered ceilings. Each facility would feel vastly different. A raised roof allows for greater circulation (so important in an athletic facility), a sense of spaciousness, more light and greater sightlines. For that matter, have you ever seen an athletic facility that didn’t have a raised roof?
Residents are encouraged to attend the Board meeting, watch it on Channel 28 or, following the meeting, go to the special renovation website. Let’s make sure we get a modern building and value for our money.