Can we all agree consideration, patience, thoughtfulness is a good thing? While discussions regarding the Fitness Center carry on, remember the outrageous mistakes made by bad design and dumb decisions. Our newest construction projects cost thousands of dollars to remedy (not fixed).
Creekside Grill has a miniaturized kitchen, tiny prep counter, tiny sink area, miniaturized refrigerator and minimalist freezer space (not fixed). The same kitchen is used to accommodate food service for nearby meeting rooms (not fixed). There were acoustical problems in the dining room’s hard surfaces, tall ceilings, walls and windows (fixed).
Fantastic golf course views were sacrificed to accommodate the cart barn, maintenance/storage area. The remaining is a view for the shoppers at the golf shop and newspaper/traffic safety offices (views gone).
The Event Center has issues, such as the constant drone of the HVAC system as background noise (not fixed). On stage, overhead lights placed in bad locations cast strange dark shadows on performers’ faces (done) while musicians struggled to read their sheet music (improved). Audiences sat under giant ceiling lights that could not be dimmed during performances (fixed). The sophisticated sound system requires a union person to operate it (not always knowledgeable). There is microphone feedback, poor sound mixing and a low humming sound in the main audio system (erratic bad sound overall, not fixed).
We do have a green room bigger than Johnny Carson’s (done).
A threatened heritage oak tree has collapsed (done). The Event Center’s asphalt parking lot successfully paved over the roots of a heritage oak and killed the tree (done, gone, just stupid).