BUILD A NEW STRUCTURE AND TEAR DOWN DEL VALLE

Carolyn PriestPtarmigan Drive

In print on page 16A

I’ve attended both forums to discuss plans for expansion of Del Valle. Originally I was in favor of renovation; now I find myself unsure this is the right way forward. Instead of phased renovations of an old poorly constructed building, which would be completed over four to six years at a cost estimated at $12 to $15 million, I now believe we must exercise due diligence and explore building a new structure, designed specifically for our needs, adjacent to the existing pool on a portion of the patio and parking lot.

After completion, the old facility would be torn down and more parking made available. During construction, approximately half of the parking lot should still be available and bus service could be increased from Gateway. The current facility would be available for use during construction, rather than trying to keep it partly open during a noisy renovation that could unveil many unforeseen problems.

A new well-designed, efficient structure would probably take no more than two to three years to complete. Though maybe slightly more costly, would result in the state-of-the art facility and keep up with expectations of future retirees.

I am surprised that committee has not seriously explored this as an option and I was not able to get a satisfactory answer about this at the forums.

It’s strange that Rossmoor can build two structures for special events, entertainment and dining but will not do so for a facility that fosters the health and well-being of the aging population. I realize cost is a factor, but surely some creative financing could be explored, including corporate sponsorship and/or a monthly temporary small user fee.