HVAC system in studios to get upgrades
In print on page 5A
expert (at the cost of not-toexceed $10,000) to work with the CEO and committee to evaluate the solar proposal and report back to the Board as soon as possible.
Studios in need
At the Residents Forum, a new “cause” was brought forth by residents Carol Lehr and Anne Shulenberger. Though each represents a different studio at Gateway, they shared a similar concern: The arts and crafts studios need help.
Lehr told the Board the Lapidary/Jewelry Studio is now being used more than ever and for an expanded repertoire of crafts that includes beading and fused glass.
Because of these additional crafts and the classes added to teach them, the studio is no longer adequate in size. Equipment is needed, such as kilns for the fused glass, and the flooring and electrical system need to be updated, Lehr said. Also, the studio needs Wi Fi access so YouTube videos can be used for teaching, she said.
Shulenberger said there are similar issues in the Ceramics Studio. Reconfiguration of space is needed and the heating and air-conditioning units are not effective, she said.
The latter should be remedied soon. The Board voted unanimously to approve the expenditure of $160,000 from the Trust Fund to upgrade the HVAC system serving the sewing, and ceramics studios and multipurpose rooms at Gateway.