Rossmoor News, April 22, 2015

CLARIFICATION ON WHAT THE BOARD HAS DONE

Diane GuilfoyDirector, District DStanley Dollar Drive

In print on page 18A

Last week an article appeared that may create some confusion among residents. It stated that the GRF Board had selected a “contractor” to “submit a detailed plan” for the renovation of Del Valle. It seemed to imply construction would begin after the submission. I’d like to clarify what the Board has done.

We have not hired a contractor in the sense of a building contractor. We have hired the Sports Management Group (SMG) to evaluate the programs that currently are provided at Del Valle, including aquatics, fitness and sports, and combine that information with results of the Del Valle Task Force survey and information on trends in sports and fitness.

SMG will work with architect ELS (who is evaluating Del Valle) to develop three schematic designs for renovation of the Del Valle complex for three levels of renovation – minor, moderate, major. These designs will be detailed but will not be construction-ready plans. Each will incorporate opportunities for phasing any renovation.

The purpose of the designs is to provide a foundation for determining the future of Del Valle. Based on these designs and the five or 10-year revenue projection, the Board can decide on what level of renovation it wants or can afford and whether to do the work in one shot or over a period of time.

Only after these decisions are made will construction-ready plans be drawn up. That may be done by the same architect or the Board may choose to go with another architect.