Rossmoor News, April 8, 2015

DROP-CREEK STRUCTURE WAY TOO EXPENSIVE

In print on page 19A

I walked by the location of the drop-creek structure and took a close look. I cannot believe it would cost half a million dollars to build a drop structure/ check dam. I wonder if the GRF Board was presented with alternative engineering designs and competitive bids.

I know from working on a few creek restoration projects that there are at least three or four different methods to reduce the gradient of the stream in order to control erosion. They vary in construction and maintenance costs as well as environmental impacts.