HOW DEL VALLE SHOULD BE DESIGNED
Jiayi ZhouGolden Rain Road
In print on page 20A
I don’t know how well we paid the architect on the Event Center, but when I first saw the construction document package, the final design product, I was startled by its rough and slipshod look. One lesson we learned from the Event Center is that we should spend enough time and money on design. Investment on painstaking and elaborate design will result in huge savings in construction and later operation. Scrapping a design and starting all over may be trivial compared to a change order during construction.
A green building is not necessarily expensive, but its design is definitely not cheap. Engineering and other consultants should be involved from the very beginning of the design process, instead be called in later stages to do routine work under architect’s instruction; they have a say on major themes and enormous coordination and cooperation must be undergone.
Another lesson from the Event Center is resident participation in the design process. The design of the Event Center was controlled by staff, project manager and architect. Some major decisions, like the acoustic system, didn’t go through the Board; even the CEO was not updated.
The more users involved in the design process of Del Valle, the more accepted the project will be by the community. Rossmoor has all kinds of talents; the design team will be greatly benefited via well-arranged interactive communications. Resident participation will save design time and cost. They could play big roles in data collecting and screening, as well many clerical jobs. Dollar house historic status certification and dog park pavement were two excellent precedents.